Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Residential Building - One or Two Family
Address NEW:
4842 S MOUNTAIN AV
Apply Date:
06/23/2022
Applicant:
Description:
R-Roof Mount PV with Production Meter and AC Disco

Permit Reviews

Permit Number - T22CM04738
Permit Status: Issued
Permit Description: R-Roof Mount PV with Production Meter and AC Disco
Start Date Submittal Complete Date Status  
06/23/2022 OTHER 07/07/2022 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T22CM04738
Permit Status: Issued
Permit Description: R-Roof Mount PV with Production Meter and AC Disco
Total Outstanding Activity Conditions - 1
Date Name
07/07/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Conditions

Permit Number - T22CM04738
Permit Status: Issued
Permit Description: R-Roof Mount PV with Production Meter and AC Disco
Date Description Comments
06/23/2022 THE INSTALLATION SHALL COMPLY WITH ALL APPLICABLE REQUIREMENTS OF SECTION 605.11.1 THROUGH 605.11.4 OF THE 2012 EDITION OF THE INTERNATIONAL FIRE CODE, THE INTERNATIONAL BUILDING CODE AND NFPA 70.

Completed Inspections

Permit Status: Issued
Permit Number: T22CM04738
Permit Description: R-Roof Mount PV with Production Meter and AC Disco
Total Completed Inspections - 6
Date Description Inspector Results Comments
09/22/2022 PDSD Building Division - TEP PM Clearance Passed {Activity date: 09/22/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - CODE INCR/POWERKILL}
09/22/2022 COT - RSEL - Service Upgrade Passed {Activity date: 09/22/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved, INCR Clearance was called into TEP at 10:55am Natalie (power-kill)}
09/30/2022 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed {Activity date: 09/30/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by RSALDAT1 - 1090}
09/30/2022 RSBU - Building Final Passed {Activity date: 09/30/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by RSALDAT1 - Approved}
09/30/2022 BULD - Electrical Clearance Passed {Activity date: 09/30/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by RSALDAT1 - CODE DGC}
09/30/2022 COT - RSEL - Electrical Final Passed {Activity date: 09/30/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by RSALDAT1 - Approved, please send DGC Clearance to TEP for the solar meter

}

Documents

File Name Document Type  
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
JOB CARD 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PLAN SET 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
STRUCTURAL CALCS 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
PLAN SET.PDF DOCUMENTS VIEW
STRUCTURAL CALCS.PDF DOCUMENTS VIEW