Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Residential Building - One or Two Family
Apply Date:
06/22/2022
Applicant:
Amy Stokes, Operations Accountant
Description:
SFR RKF55J T21-M0088

Permit Reviews

Permit Number - T22CM04696
Permit Status: Issued
Permit Description: SFR RKF55J T21-M0088
Start Date Submittal Complete Date Status  
06/22/2022 OTHER 08/05/2022 COMPLETED Review Details
11/03/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 11/05/2023 APPROVED Review Details
09/26/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 09/27/2023 APPROVED Review Details

Conditions

Permit Number - T22CM04696
Permit Status: Issued
Permit Description: SFR RKF55J T21-M0088
Date Description Comments
06/22/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
06/22/2022 ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)
06/22/2022 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
08/05/2022 PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE OF PERMIT.
11/03/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
11/03/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
09/27/2023 NO FINAL UNTIL THE DISCHARGE AUTHORIZATION FOR #P21SD00033 IS ISSUED BY PDEQ
11/03/2023 Post-Tension Inspection Report is required.
11/03/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.

Completed Inspections

Permit Status: Issued
Permit Number: T22CM04696
Permit Description: SFR RKF55J T21-M0088
Total Completed Inspections - 24
Date Description Inspector Results Comments
10/19/2022 COT - RSPL - Rough Soil Passed {Activity date: 10/19/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP}
11/04/2022 COT - RSEL - Grounding/Bonding Passed
11/04/2022 COT - RSBU - Preslab Passed
11/04/2022 COT - RSEL - Electrical Underground Passed
11/04/2022 COT - RSBU - Excavation/Rebar/Zoning Passed
01/30/2023 COT - RSBU - Roof Nailing Passed
03/15/2023 COT - RSPL - Yard Water Line Passed
03/15/2023 COT - RSPL - Sewer Passed
03/27/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
03/27/2023 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
03/27/2023 COT - LCPL - Plumbing Intermediate Passed
03/27/2023 COT - RSPL - Gas Pressure Test Passed
04/10/2023 COT - HCBU - Interior Shear Bracing Passed
05/16/2023 COT - RSEL - Construction Power Passed TEP ECO
05/16/2023 BULD - Electrical Clearance Passed TEP ECO
06/20/2023 COT - BULD - SWG Clearance Passed passed
06/22/2023 COT - RSPL - Plumbing Final Passed
06/22/2023 COT - LCBU - Framing Passed
06/22/2023 COT - RSEL - Outdoor Lighting Passed
06/22/2023 RSBU - Building Final Passed
06/22/2023 COT - RSME - Mechanical Final Passed
06/22/2023 RSME - Mechanical Progress Passed
06/22/2023 COT - RSEL - Electrical Final Passed
06/22/2023 ENGR Engineering Final Passed

Documents

File Name Document Type  
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
SIC 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
SITE PLAN 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
220365 - RINCON KNOLLS LOT 270 - PT REPORT-2023-10-31_V1.PDF DOCUMENTS VIEW
F55J APPROVED TRUSS CALCS 9-12-23 - ALLIANCE TRUSS_V1.PDF DOCUMENTS VIEW
CONS-EQ SEWER DA_V1.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
SIC.PDF DOCUMENTS VIEW
SITE PLAN.PDF DOCUMENTS VIEW