Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Apply Date:
06/22/2022
Applicant:
Amy Stokes, Operations Accountant
Description:
SFR RKF55C T21-M0085

Permit Reviews

Permit Number - T22CM04694
Permit Status: Complete
Permit Description: SFR RKF55C T21-M0085
Start Date Submittal Complete Date Status  
10/12/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/16/2023 APPROVED Review Details

Conditions

Permit Number - T22CM04694
Permit Status: Complete
Permit Description: SFR RKF55C T21-M0085
Date Description Comments
06/22/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
06/22/2022 ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)
06/22/2022 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
06/22/2022 NO FINAL UNTIL THE DISCHARGE AUTHORIZATIONFOR #P21SD00033 IS ISSUED BY PDEQ
10/13/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
10/13/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
10/13/2023 Post-Tension Inspection Report is required.
10/13/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
10/13/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: T22CM04694
Permite Description: SFR RKF55C T21-M0085
Total Outstanding Inspections - 6
Last Inspection Date Description Inspector Results Comments
10/26/2022 COT - RSEL - Grounding/Bonding N/A Not Ready
10/26/2022 COT - RSBU - Preslab N/A Not Ready
10/26/2022 COT - RSEL - Electrical Underground N/A Not Ready
10/26/2022 COT - RSBU - Excavation/Rebar/Zoning N/A Not Ready
10/26/2022 COT - RSPL - Sewer N/A Not Ready
10/27/2022 COT - RSPL - Plumbing Final N/A Not Ready

Completed Inspections

Permit Status: Complete
Permit Number: T22CM04694
Permit Description: SFR RKF55C T21-M0085
Total Completed Inspections - 21
Date Description Inspector Results Comments
10/12/2022 COT - RSPL - Rough Soil Passed {Activity date: 10/12/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP}
01/25/2023 COT - RSBU - Roof Nailing Passed
01/25/2023 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
03/15/2023 COT - RSPL - Yard Water Line Passed
05/10/2023 COT - RSPL - Sewer Passed
06/01/2023 COT - LCBU - Framing Passed
06/01/2023 COT - RSPL - Gas Pressure Test Passed
06/01/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
06/01/2023 COT - LCPL - Plumbing Intermediate Passed
06/01/2023 RSME - Mechanical Progress Passed
06/12/2023 COT - HCBU - Interior Shear Bracing Passed
06/21/2023 COT - RSEL - Construction Power Passed passed
06/21/2023 BULD - Electrical Clearance Passed
08/16/2023 PDSD Building Division - Unspecified In-Field Passed 8/16/23 Passed per engineer letter letter attached.
10/03/2023 COT - BULD - SWG Clearance Passed
10/03/2023 COT - RSPL - Plumbing Final Passed
10/11/2023 COT - RSEL - Electrical Final Passed
10/11/2023 ENGR Engineering Final Passed
10/11/2023 RSBU - Building Final Passed
10/11/2023 COT - RSME - Mechanical Final Passed
10/11/2023 COT - RSEL - Outdoor Lighting Passed

Documents

File Name Document Type  
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
JOB CARD 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
SIC 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
SITE PLAN 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
CONS-220365 RINCON KNOLLS PT REPORT LOT 269_V1.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
SIC.PDF DOCUMENTS VIEW
SITE PLAN.PDF DOCUMENTS VIEW