Permit: T22CM04684
Permit Details
Status:
Issued
Type:
Residential Building - One or Two Family
Address:
12771 E TORTOISE POINTE PL
Address NEW:
12771 E TORTOISE POINTE PL
Apply Date:
06/21/2022
Applicant:
Amy Stokes, Operations Accountant
Description:
SFR RKF55I T21-M0086
Permit Reviews
Permit Number - T22CM04684
Permit Status: Issued
Permit Description: SFR RKF55I T21-M0086
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/28/2022 | OTHER | 08/05/2022 | COMPLETED |
| 09/26/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/26/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - T22CM04684
Permit Status: Issued
Permit Description: SFR RKF55I T21-M0086
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 06/21/2022 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) |
| 09/26/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Conditions
Permit Number - T22CM04684
Permit Status: Issued
Permit Description: SFR RKF55I T21-M0086
| Date | Description | Comments |
|---|---|---|
| 06/21/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. | |
| 06/21/2022 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 06/21/2022 | NO FINAL UNTIL THE DISCHARGE AUTHORIZATION FOR #P21SD00033 IS ISSUED BY PDEQ | |
| 09/26/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 09/26/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 09/26/2023 | Post-Tension Inspection Report is required. | |
| 09/26/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 09/26/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
Outstanding Inspections
Permit Status: Issued
Permit Number: T22CM04684
Permite Description: SFR RKF55I T21-M0086
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2022 | RSME - Mechanical Progress | N/A | Not Ready | |
| 10/27/2022 | COT - RSPL - Plumbing Final | N/A | Not Ready | |
| 10/27/2022 | ENGR Engineering Final | N/A | Not Ready | |
| 09/08/2023 | FCON – Fire – Intermediate | N/A | Not Applicable |
Completed Inspections
Permit Status: Issued
Permit Number: T22CM04684
Permit Description: SFR RKF55I T21-M0086
Total Completed Inspections - 24
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/20/2022 | COT - RSPL - Rough Soil | Passed | {Activity date: 09/20/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
| 10/03/2022 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 10/03/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
| 10/03/2022 | COT - RSBU - Preslab | Passed | {Activity date: 10/03/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
| 10/03/2022 | COT - RSEL - Electrical Underground | Passed | {Activity date: 10/03/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
| 10/03/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 10/03/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
| 11/07/2022 | COT - RSBU - Roof Nailing | Passed | ||
| 01/25/2023 | COT - RSPL - Sewer | Passed | ||
| 02/09/2023 | COT - RSPL - Yard Water Line | Passed | ||
| 03/07/2023 | COT - RSEL - Construction Power | Passed | TEP ECO | |
| 03/20/2023 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 03/20/2023 | COT - LCBU - Framing | Passed | ||
| 03/20/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 03/20/2023 | COT - LCPL - Plumbing Intermediate | Passed | ||
| 03/20/2023 | COT - RSPL - Gas Pressure Test | Passed | ||
| 03/24/2023 | BULD - Electrical Clearance | Passed | Previously approved 3/7/23, ECO Clearance to TEP is required for the construction power | |
| 04/04/2023 | COT - HCBU - Interior Shear Bracing | Passed | ||
| 07/20/2023 | COT - BULD - SWG Clearance | Passed | swg clearance for meter only | |
| 08/08/2023 | COT - RSME - Mechanical Final | Passed | ||
| 08/08/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
| 08/11/2023 | RSBU - Building Final | Passed | ||
| 08/11/2023 | COT - RSEL - Electrical Final | Passed | ||
| 08/11/2023 | COT - RSPL - Plumbing Final | Passed | ||
| 08/17/2023 | ENGR Engineering Final | Passed | ||
| 09/08/2023 | COT - FCON - Fire - Final | Passed |