Permit: T22CM04560
Permit Details
Apply Date:
06/17/2022
Applicant:
Denise Dunning
Description:
SFR F60C22 T22-M0020
Permit Reviews
Permit Number - T22CM04560
Permit Status: Expired
Permit Description: SFR F60C22 T22-M0020
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
06/17/2022 | OTHER | 08/01/2022 | COMPLETED |
12/19/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 12/22/2023 | REQUIRES RESUBMIT |
12/11/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 12/11/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - T22CM04560
Permit Status: Expired
Permit Description: SFR F60C22 T22-M0020
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
12/18/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Conditions
Permit Number - T22CM04560
Permit Status: Expired
Permit Description: SFR F60C22 T22-M0020
Date | Description | Comments |
---|---|---|
06/17/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. | |
06/17/2022 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
12/11/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
12/11/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
12/11/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
Completed Inspections
Permit Status: Expired
Permit Number: T22CM04560
Permit Description: SFR F60C22 T22-M0020
Total Completed Inspections - 23
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/07/2022 | COT - RSPL - Yard Water Line | Passed | {Activity date: 09/07/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
09/07/2022 | COT - RSPL - Sewer | Passed | {Activity date: 09/07/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
09/07/2022 | COT - RSPL - Rough Soil | Passed | {Activity date: 09/07/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
09/21/2022 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 09/21/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
09/21/2022 | COT - RSBU - Preslab | Passed | {Activity date: 09/21/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
09/21/2022 | COT - RSEL - Electrical Underground | Passed | {Activity date: 09/21/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
09/21/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 09/21/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
11/22/2022 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
11/23/2022 | COT - RSBU - Roof Nailing | Passed | ||
03/07/2023 | COT - RSPL - Gas Pressure Test | Passed | ||
03/07/2023 | RSME - Mechanical Progress | Passed | ||
03/10/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Approved. Corrections were made. 3/10/2023 | |
03/10/2023 | COT - LCBU - Framing | Passed | Approved. Corrections were made. 3/10/2023 | |
03/10/2023 | COT - LCPL - Plumbing Intermediate | Passed | Approved. Corrections were made. 3/10/2023 | |
03/30/2023 | COT - HCBU - Interior Shear Bracing | Passed | ||
04/25/2023 | COT - RSEL - Construction Power | Passed | TEP ECO | |
06/22/2023 | COT - BULD - SWG Clearance | Passed | 6/22/23: SWG Clearance for meter only. | |
07/26/2023 | COT - RSME - Mechanical Final | Passed | ||
07/26/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
07/26/2023 | RSBU - Building Final | Passed | ||
07/26/2023 | COT - RSPL - Plumbing Final | Passed | ||
07/26/2023 | COT - FCON - Sprinkler - Final | Passed | Approved on 7/19/23 on permit TF-FCP-1122-00173 | |
07/27/2023 | COT - RSEL - Electrical Final | Passed |