Permit: T22CM04498
Permit Details
Apply Date:
06/16/2022
Applicant:
Andrea Flood
Description:
SFR F40G22 T22-M0025
Permit Reviews
Permit Number - T22CM04498
Permit Status: Issued
Permit Description: SFR F40G22 T22-M0025
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
10/24/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/30/2023 | APPROVED |
10/19/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/20/2023 | APPROVED |
Conditions
Permit Number - T22CM04498
Permit Status: Issued
Permit Description: SFR F40G22 T22-M0025
Date | Description | Comments |
---|---|---|
06/16/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. | |
06/16/2022 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) | |
06/16/2022 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
06/16/2022 | NO FINAL UNTIL THE PUBLIC SEWER G-2020-053/P20WP00249 IS ACCEPTED AND RELEASED BY PCRWRD |
Outstanding Inspections
Permit Status: Issued
Permit Number: T22CM04498
Permite Description: SFR F40G22 T22-M0025
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/27/2023 | RSBU - Building Final | N/A | Re-inspection required | 6/27/23: Garage door must be able to self close. |
Completed Inspections
Permit Status: Issued
Permit Number: T22CM04498
Permit Description: SFR F40G22 T22-M0025
Total Completed Inspections - 22
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/29/2022 | COT - RSPL - Yard Water Line | Passed | {Activity date: 07/29/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
07/29/2022 | COT - RSPL - Sewer | Passed | {Activity date: 07/29/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
07/29/2022 | COT - RSPL - Rough Soil | Passed | {Activity date: 07/29/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
08/09/2022 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 08/09/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
08/09/2022 | COT - RSBU - Preslab | Passed | {Activity date: 08/09/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
08/09/2022 | COT - RSEL - Electrical Underground | Passed | {Activity date: 08/09/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
08/09/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 08/09/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
09/13/2022 | COT - RSBU - Roof Nailing | Passed | {Activity date: 09/13/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
09/13/2022 | COT - RSBU - Exterior Clips/Sheathing | Passed | {Activity date: 09/13/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
01/19/2023 | RSME - Mechanical Progress | Passed | ||
01/19/2023 | COT - RSPL - Gas Pressure Test | Passed | ||
01/19/2023 | COT - LCPL - Plumbing Intermediate | Passed | ||
01/19/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
01/19/2023 | COT - LCBU - Framing | Passed | ||
01/19/2023 | COT - RSEL - Construction Power | Passed | TEP ECO | |
02/01/2023 | COT - HCBU - Interior Shear Bracing | Passed | ||
06/07/2023 | COT - BULD - SWG Clearance | Passed | Approved, SWG Clearance is required | |
06/27/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
06/27/2023 | COT - RSEL - Electrical Final | Passed | ||
06/27/2023 | COT - RSME - Mechanical Final | Passed | ||
06/27/2023 | COT - RSPL - Plumbing Final | Passed | ||
06/28/2023 | RSBU - Building Final | Passed | 6/27/23: Garage door must be able to self close. 6/28/23: passed |