Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T22CM04450
Permit Details
Apply Date:
06/15/2022
Applicant:
Andrea Flood
Description:
SFR F40J22 T22-M0022
Permit Reviews
Permit Number - T22CM04450
Permit Status: Complete
Permit Description: SFR F40J22 T22-M0022
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
06/15/2022 | OTHER | 08/01/2022 | COMPLETED |
08/25/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/31/2023 | APPROVED |
08/14/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/16/2023 | APPROVED |
Conditions
Permit Number - T22CM04450
Permit Status: Complete
Permit Description: SFR F40J22 T22-M0022
Date | Description | Comments |
---|---|---|
06/15/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. | |
06/15/2022 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) | |
06/15/2022 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
06/15/2022 | NO FINAL UNTIL THE PUBLIC SEWER G-2020-053/P20WP00249 IS ACCEPTED AND RELEASED BY PCRWRD | |
08/31/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Outstanding Inspections
Permit Status: Complete
Permit Number: T22CM04450
Permite Description: SFR F40J22 T22-M0022
Total Outstanding Inspections - 5
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/26/2022 | COT - FCON - Sprinkler - Final | N/A | Not Ready | |
10/27/2022 | RSBU - Building Final | N/A | Not Ready | |
10/27/2022 | COT - RSEL - Electrical Final | N/A | Not Ready | |
10/27/2022 | COT - RSEL - Outdoor Lighting | N/A | Not Ready | |
10/27/2022 | COT - RSME - Mechanical Final | N/A | Not Ready |
Completed Inspections
Permit Status: Complete
Permit Number: T22CM04450
Permit Description: SFR F40J22 T22-M0022
Total Completed Inspections - 22
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/08/2022 | COT - RSPL - Yard Water Line | Passed | {Activity date: 08/08/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
08/08/2022 | COT - RSPL - Sewer | Passed | {Activity date: 08/08/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
08/08/2022 | COT - RSPL - Rough Soil | Passed | {Activity date: 08/08/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
08/18/2022 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 08/18/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
08/18/2022 | COT - RSBU - Preslab | Passed | {Activity date: 08/18/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
08/18/2022 | COT - RSEL - Electrical Underground | Passed | {Activity date: 08/18/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
08/18/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 08/18/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
09/27/2022 | COT - RSBU - Roof Nailing | Passed | {Activity date: 09/27/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
09/27/2022 | COT - RSBU - Exterior Clips/Sheathing | Passed | {Activity date: 09/27/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
04/06/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
04/06/2023 | COT - LCPL - Plumbing Intermediate | Passed | ||
04/06/2023 | COT - RSPL - Gas Pressure Test | Passed | ||
04/06/2023 | RSME - Mechanical Progress | Passed | ||
04/06/2023 | COT - LCBU - Framing | Passed | ||
04/07/2023 | COT - RSEL - Construction Power | Passed | ||
04/21/2023 | COT - HCBU - Interior Shear Bracing | Passed | ||
08/02/2023 | COT - BULD - SWG Clearance | Passed | SWG clearance issued | |
08/02/2023 | COT - RSPL - Plumbing Final | Passed | ||
08/15/2023 | RSBU - Building Final | Passed | ||
08/15/2023 | COT - RSEL - Electrical Final | Passed | ||
08/15/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
08/15/2023 | COT - RSME - Mechanical Final | Passed |