Permit Reviews

Permit Number - T22CM04450
Permit Status: Complete
Permit Description: SFR F40J22 T22-M0022
Start Date Submittal Complete Date Status  
06/15/2022 OTHER 08/01/2022 COMPLETED Review Details
08/25/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 08/31/2023 APPROVED Review Details
08/14/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 08/16/2023 APPROVED Review Details

Conditions

Permit Number - T22CM04450
Permit Status: Complete
Permit Description: SFR F40J22 T22-M0022
Date Description Comments
06/15/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
06/15/2022 ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)
06/15/2022 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
06/15/2022 NO FINAL UNTIL THE PUBLIC SEWER G-2020-053/P20WP00249 IS ACCEPTED AND RELEASED BY PCRWRD
08/31/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Outstanding Inspections

Permit Status: Complete
Permit Number: T22CM04450
Permite Description: SFR F40J22 T22-M0022
Total Outstanding Inspections - 5
Last Inspection Date Description Inspector Results Comments
10/26/2022 COT - FCON - Sprinkler - Final N/A Not Ready
10/27/2022 RSBU - Building Final N/A Not Ready
10/27/2022 COT - RSEL - Electrical Final N/A Not Ready
10/27/2022 COT - RSEL - Outdoor Lighting N/A Not Ready
10/27/2022 COT - RSME - Mechanical Final N/A Not Ready

Completed Inspections

Permit Status: Complete
Permit Number: T22CM04450
Permit Description: SFR F40J22 T22-M0022
Total Completed Inspections - 22
Date Description Inspector Results Comments
08/08/2022 COT - RSPL - Yard Water Line Passed {Activity date: 08/08/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP}
08/08/2022 COT - RSPL - Sewer Passed {Activity date: 08/08/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP}
08/08/2022 COT - RSPL - Rough Soil Passed {Activity date: 08/08/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP}
08/18/2022 COT - RSEL - Grounding/Bonding Passed {Activity date: 08/18/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP}
08/18/2022 COT - RSBU - Preslab Passed {Activity date: 08/18/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP}
08/18/2022 COT - RSEL - Electrical Underground Passed {Activity date: 08/18/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP}
08/18/2022 COT - RSBU - Excavation/Rebar/Zoning Passed {Activity date: 08/18/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP}
09/27/2022 COT - RSBU - Roof Nailing Passed {Activity date: 09/27/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP}
09/27/2022 COT - RSBU - Exterior Clips/Sheathing Passed {Activity date: 09/27/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP}
04/06/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
04/06/2023 COT - LCPL - Plumbing Intermediate Passed
04/06/2023 COT - RSPL - Gas Pressure Test Passed
04/06/2023 RSME - Mechanical Progress Passed
04/06/2023 COT - LCBU - Framing Passed
04/07/2023 COT - RSEL - Construction Power Passed
04/21/2023 COT - HCBU - Interior Shear Bracing Passed
08/02/2023 COT - BULD - SWG Clearance Passed SWG clearance issued
08/02/2023 COT - RSPL - Plumbing Final Passed
08/15/2023 RSBU - Building Final Passed
08/15/2023 COT - RSEL - Electrical Final Passed
08/15/2023 COT - RSEL - Outdoor Lighting Passed
08/15/2023 COT - RSME - Mechanical Final Passed

Documents

File Name Document Type  
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
SIC 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
SITE PLAN 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
CONS-152455 - SAGUARO TRAILS PT FINAL - LOT 3211_V1.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
SITE PLAN.PDF DOCUMENTS VIEW
SIC.PDF DOCUMENTS VIEW