Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T22CM04391
Permit Details
Apply Date:
06/13/2022
Applicant:
ramon polanco
Description:
SFR BRIOS1432 T20-M0059
Permit Reviews
Permit Number - T22CM04391
Permit Status: Complete
Permit Description: SFR BRIOS1432 T20-M0059
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
06/13/2022 | OTHER | 08/02/2022 | COMPLETED |
02/07/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 02/09/2024 | APPROVED |
04/01/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 04/02/2024 | APPROVED |
Conditions
Permit Number - T22CM04391
Permit Status: Complete
Permit Description: SFR BRIOS1432 T20-M0059
Date | Description | Comments |
---|---|---|
03/18/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
03/28/2024 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. | |
03/28/2024 | Plan review applications expire 180 days from date of submittal unless the permit has been issued. Permits expire 180 days after issuance or last approved inspection. | |
03/28/2024 | GCL and Bond Exemption required prior to final inspection. | |
03/28/2024 | SPECIAL INSPECTION FORMS AND REPORTS REQUIRED PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY. | |
03/28/2024 | This building permit approval is without public sewer connection review or approval. It is strictly the responsibility of the owner and/or person doing the work to ensure that the appropriate review and approval to connect is obtained from Regional Wastewater Reclamation Department (RWRD) wastewater provider or Pima County DEQ approval of/and alternative disposal system. It is required that owner and/or person doing the work solicit all requisite approvals from the wastewater provider prior to obtaining this building construction permit. RWRD connection information is available at www.pima.gov/wwm/developer.htm | |
03/28/2024 | WATER METER SIZE | |
03/18/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
03/28/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
03/28/2024 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. | |
03/28/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: T22CM04391
Permite Description: SFR BRIOS1432 T20-M0059
Total Outstanding Inspections - 3
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | COT - RSPL - Plumbing Final | N/A | Not Ready | |
12/18/2023 | COT - RSBU - Sustainability | N/A | Not Applicable | |
12/19/2023 | COT - RSEL - Construction Power | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: T22CM04391
Permit Description: SFR BRIOS1432 T20-M0059
Total Completed Inspections - 21