Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T22CM04360
Permit Details
Apply Date:
06/13/2022
Applicant:
Description:
SFR 235.2960 T21-M0055
Permit Reviews
Permit Number - T22CM04360
Permit Status: Issued
Permit Description: SFR 235.2960 T21-M0055
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
06/13/2022 | OTHER | 08/08/2022 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T22CM04360
Permit Status: Issued
Permit Description: SFR 235.2960 T21-M0055
Total Outstanding Activity Conditions - 4
Date | Name |
---|---|
06/13/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
06/13/2022 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) |
06/13/2022 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
06/13/2022 | NO FINAL UNTIL THE PUBLIC SEWER G-2020-059/P21WP00060, G-20-089/P21WP00061 AND THE DOWNSTREAM OFFSITE PUBLIC SEWER FORPARCEL 4 G-2020-087 IS ACCEPTED AND RELEASED BY PCRWRD |
Outstanding Inspections
Permit Status: Issued
Permit Number: T22CM04360
Permite Description: SFR 235.2960 T21-M0055
Total Outstanding Inspections - 3
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/26/2022 | COT - RSBU - Exterior Clips/Sheathing | N/A | Not Ready | |
04/03/2023 | COT - RSPL - Plumbing Final | N/A | Not Ready | Not ready for final inspection. |
05/30/2023 | RSBU - Building Final | N/A | Re-inspection required | 5/30/23: refrigerant line needs to be wrapped with uv tape, condensate pipe must be cut 6" above grade, front door seal must be put on, stove anti-tip missing, attic exhaust fan has continuous power. Heat strip must be labeled on furnace. Water line must be insulated |
Completed Inspections
Permit Status: Issued
Permit Number: T22CM04360
Permit Description: SFR 235.2960 T21-M0055
Total Completed Inspections - 21
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/30/2022 | COT - RSPL - Yard Water Line | Passed | {Activity date: 08/30/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
08/30/2022 | COT - RSPL - Rough Soil | Passed | {Activity date: 08/30/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
09/07/2022 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 09/07/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - approved} | |
09/07/2022 | COT - RSBU - Preslab | Passed | {Activity date: 09/07/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - approved} | |
09/07/2022 | COT - RSEL - Electrical Underground | Passed | {Activity date: 09/07/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - approved} | |
09/07/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 09/07/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - approved} | |
09/23/2022 | COT - RSBU - Roof Nailing | Passed | {Activity date: 09/23/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - approved} | |
12/08/2022 | COT - RSEL - Construction Power | Passed | clearance for TEP ECO. | |
12/08/2022 | COT - LCBU - Framing | Passed | ||
12/08/2022 | COT - RSPL - Gas Pressure Test | Passed | holding 15 psi. | |
12/13/2022 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | corrections were made | |
12/13/2022 | COT - LCPL - Plumbing Intermediate | Passed | corrections were made | |
01/18/2023 | COT - HCBU - Interior Shear Bracing | Passed | ||
04/03/2023 | COT - RSPL - Sewer | Passed | Underground sewer lines are connected to main sewer line. Okay to backfill trench. | |
05/17/2023 | COT - BULD - SWG Clearance | Passed | SWG FOR METER ONLY | |
05/17/2023 | COT - RSPL - Plumbing Final | Passed | ||
05/30/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
05/30/2023 | RSME - Mechanical Progress | Passed | ||
05/31/2023 | RSBU - Building Final | Passed | ||
05/31/2023 | COT - RSME - Mechanical Final | Passed | ||
05/31/2023 | COT - RSEL - Electrical Final | Passed |