Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T22CM04326
Permit Details
Apply Date:
06/10/2022
Applicant:
Rosebelle Ann Sanoria
Description:
R - Installation of 15.01KW PV System/Derate to 175A
Permit Reviews
Permit Number - T22CM04326
Permit Status: Issued
Permit Description: R - Installation of 15.01KW PV System/Derate to 175A
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
06/10/2022 | OTHER | 08/19/2022 | COMPLETED |
09/07/2022 | REVISION - - 1ST | 10/20/2022 | ACTIVE |
11/15/2022 | RESIDENTIAL SOLAR v.2 | 11/15/2022 | APPROVED |
11/07/2022 | RESIDENTIAL SOLAR v.1 | 11/15/2022 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - T22CM04326
Permit Status: Issued
Permit Description: R - Installation of 15.01KW PV System/Derate to 175A
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
08/18/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Conditions
Permit Number - T22CM04326
Permit Status: Issued
Permit Description: R - Installation of 15.01KW PV System/Derate to 175A
Date | Description | Comments |
---|---|---|
06/10/2022 | THE INSTALLATION SHALL COMPLY WITH ALL APPLICABLE REQUIREMENTS OF SECTION 605.11.1 THROUGH 605.11.4 OF THE 2012 EDITION OF THE INTERNATIONAL FIRE CODE, THE INTERNATIONAL BUILDING CODE AND NFPA 70. |
Outstanding Inspections
Permit Status: Issued
Permit Number: T22CM04326
Permite Description: R - Installation of 15.01KW PV System/Derate to 175A
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | COT - RSEL - Electrical Final | N/A | Not Ready |
Completed Inspections
Permit Status: Issued
Permit Number: T22CM04326
Permit Description: R - Installation of 15.01KW PV System/Derate to 175A
Total Completed Inspections - 2
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/11/2023 | BULD - Electrical Clearance | Passed | ||
01/11/2023 | RSBU - Building Final | Passed |