Permit: T22CM04323
Permit Details
Apply Date:
06/10/2022
Applicant:
Sunrun Installation Services, Inc
Description:
R - SYSTEM SIZE: 4760W DC, 3840W AC - MODULES: (14) JA SOLAR: JAM60S10-340/MR - INVERTERS: (1) DELTA ELECTRONICS: E4-TL-US - RACKING: ; SOLLEGA FASTRACK510 WITH 304 STAINLESS STEEL HARDWARE - MAIN PANEL REPLACEMENT: EXISTING 125 AMP MAIN PANEL WITH AMP MAIN BREAKER TO BE REPLACED WITH NEW 225 AMP MAIN PANEL WITH 200 AMP MAIN BREAKER. - RAPID SHUTDOWN: (14) APSMART RSD-S-PLC ROOFTOP MODULE LEVEL RAPID SHUTDOWN DEVICE
Architects:
- same as above
Contractors:
- Sunrun Installation Services, Inc
Permit Reviews
Permit Number - T22CM04323
Permit Status: Final
Permit Description: R - SYSTEM SIZE: 4760W DC, 3840W AC
- MODULES: (14) JA SOLAR: JAM60S10-340/MR
- INVERTERS: (1) DELTA ELECTRONICS: E4-TL-US
- RACKING: ; SOLLEGA FASTRACK510 WITH 304 STAINLESS
STEEL HARDWARE
- MAIN PANEL REPLACEMENT: EXISTING 125 AMP MAIN
PANEL WITH AMP MAIN BREAKER TO BE REPLACED WITH
NEW 225 AMP MAIN PANEL WITH 200 AMP MAIN BREAKER.
- RAPID SHUTDOWN: (14) APSMART RSD-S-PLC ROOFTOP
MODULE LEVEL RAPID SHUTDOWN DEVICE
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/10/2022 | OTHER | 08/31/2022 | COMPLETED |
Completed Inspections
Permit Status: Final
Permit Number: T22CM04323
Permit Description: R - SYSTEM SIZE: 4760W DC, 3840W AC
- MODULES: (14) JA SOLAR: JAM60S10-340/MR
- INVERTERS: (1) DELTA ELECTRONICS: E4-TL-US
- RACKING: ; SOLLEGA FASTRACK510 WITH 304 STAINLESS
STEEL HARDWARE
- MAIN PANEL REPLACEMENT: EXISTING 125 AMP MAIN
PANEL WITH AMP MAIN BREAKER TO BE REPLACED WITH
NEW 225 AMP MAIN PANEL WITH 200 AMP MAIN BREAKER.
- RAPID SHUTDOWN: (14) APSMART RSD-S-PLC ROOFTOP
MODULE LEVEL RAPID SHUTDOWN DEVICE
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/23/2022 | TEP CLEARANCE - PM | TGAUSP | Approved | CODE INCR/POWERKILL |
| 09/23/2022 | ELECTRIC - SERVICE UPGRADE | TGAUSP | Approved | Approved, INCR Clearance was called into TEP at 11:00am (power-kill) |
| 09/30/2022 | TEP CLEARANCE - AM | DQUINN | Approved | CODE DGC |
| 09/30/2022 | BUILDING - FINAL | DQUINN | Approved | Ap Clear dgc Close permit |
| 09/30/2022 | ELECTRIC - FINAL | DQUINN | Approved | Ap Clear dgc Close permit |