Permit: T22CM04224
Permit Details
Apply Date:
06/07/2022
Applicant:
Hawkins Electric Inc.
Description:
Fuel station underground fuel lines and tanks are being replaced. Disconnect electric to (4) dispensers and (3) fuel turbines. Cut conduit back, roll up existing wires. After tanks are replaced, re-hook up existing dispensers and turbines with existing circuits. No new loads added. Need inspections for tying conduits back into existing equipment and a seal off packing and pouring inspection (underground/seal-off/final). Permits already obtained for this project: ADEQ Removal Permit #DC4946.001, ADEQ Install Permit #NT4946.001, Tucson Fire Tank Removal Permit #T22FC00320, Tucson Fire Tank Install Permit #T22FC00321.
Contractors:
- Hawkins Electric Inc.
Permit Reviews
Permit Number - T22CM04224
Permit Status: Final
Permit Description: Fuel station underground fuel lines and tanks are being replaced. Disconnect electric to (4) dispensers and (3) fuel
turbines. Cut conduit back, roll up existing wires. After tanks are replaced, re-hook up existing dispensers and turbines
with existing circuits. No new loads added. Need inspections for tying conduits back into existing equipment and a seal off packing and pouring inspection (underground/seal-off/final). Permits already obtained for this project: ADEQ Removal Permit #DC4946.001, ADEQ Install Permit #NT4946.001, Tucson Fire Tank Removal Permit #T22FC00320, Tucson Fire Tank Install Permit #T22FC00321.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/07/2022 | COMMERCIAL - BLDG/FIRE/ZONING/ENG | 07/18/2022 | COMPLETED |
Completed Inspections
Permit Status: Final
Permit Number: T22CM04224
Permit Description: Fuel station underground fuel lines and tanks are being replaced. Disconnect electric to (4) dispensers and (3) fuel
turbines. Cut conduit back, roll up existing wires. After tanks are replaced, re-hook up existing dispensers and turbines
with existing circuits. No new loads added. Need inspections for tying conduits back into existing equipment and a seal off packing and pouring inspection (underground/seal-off/final). Permits already obtained for this project: ADEQ Removal Permit #DC4946.001, ADEQ Install Permit #NT4946.001, Tucson Fire Tank Removal Permit #T22FC00320, Tucson Fire Tank Install Permit #T22FC00321.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/31/2022 | ELECTRIC - UNDERGROUND | DQUINN | Approved | Ap All underground elec ok to backfill. |
| 09/15/2022 | ELECTRIC - FINAL | JBURGE | Approved | Approved. Please close out this permit. NOTE: ADEQ must determine if dirt removed from leaking tank are is hazardous material and arrange for the remove of subject dirt. |
| 09/15/2022 | ELECTRIC - INTERMEDIATE | JBURGE | Approved | Approved |
| 09/15/2022 | BUILDING - FINAL | JBURGE | Approved | Approved |