Permit: T22CM04179
Permit Details
Status:
Issued
Type:
Residential Building - One or Two Family
Address:
243 E 25TH ST 2
Address NEW:
243 E 25TH ST 2
Apply Date:
06/06/2022
Applicant:
Oscar Juarez
Description:
SFR
Permit Reviews
Permit Number - T22CM04179
Permit Status: Issued
Permit Description: SFR
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/06/2022 | RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO | 07/01/2022 | COMPLETED |
| 07/19/2022 | RESUBMITTAL | 07/22/2022 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T22CM04179
Permit Status: Issued
Permit Description: SFR
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 04/26/2024 | Separate submittal to PC RWRD is required prior to final for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Outstanding Inspections
Permit Status: Issued
Permit Number: T22CM04179
Permite Description: SFR
Total Outstanding Inspections - 5
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/22/2022 | COT - LCPL - Plumbing Intermediate | N/A | Canceled | {Activity date: 06/22/2022; Status: Not Applicable; Inspector: KEN; Comment: Entered by KKARSEN1 - } |
| 06/22/2022 | RSME - Mechanical Progress | N/A | Canceled | {Activity date: 06/22/2022; Status: Not Applicable; Inspector: KEN; Comment: Entered by KKARSEN1 - } |
| 10/26/2022 | COT - RSPL - Sewer | N/A | Not Ready | |
| 10/26/2022 | COT - RSBU - Preslab | N/A | Not Ready | |
| 03/14/2023 | COT - RSBU - Excavation/Rebar/Zoning | N/A | Not Ready | No plans on site stopped inspection |
Completed Inspections
Permit Status: Issued
Permit Number: T22CM04179
Permit Description: SFR
Total Completed Inspections - 17
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/06/2023 | COT - RSPL - Rough Soil | Passed | Okay to backfill. Shading required. | |
| 03/06/2023 | COT - RSPL - Sewer | Passed | Okay to backfill. Shading required. | |
| 03/16/2023 | COT - RSBU - Preslab | Passed | ||
| 03/16/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 3/16/2023 approved okay for concrete in footings. | |
| 03/16/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
| 04/10/2023 | BULD - Electrical Clearance | Passed | Electrical panel is properly attached to structure and ground wire is connected to the ufer ground in concrete footing. Okay to energize panel from temporary construction power. | |
| 04/10/2023 | COT - RSBU - Roof Nailing | Passed | Roof is properly nailed. Okay to dry in and apply roofing material. | |
| 04/10/2023 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | H2.5 clips are installed and properly nailed off. | |
| 04/10/2023 | COT - RSEL - Construction Power | Passed | Panel is attached to building and connect ufer ground. Okay to energize panel. | |
| 04/21/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Approved. 4/21/2023 | |
| 04/21/2023 | COT - LCBU - Framing | Passed | Approved. 4/21/2023 | |
| 04/21/2023 | COT - RSPL - Yard Water Line | Passed | ||
| 05/19/2023 | COT - RSME - Mechanical Final | Passed | ||
| 05/19/2023 | RSBU - Building Final | Passed | ||
| 05/19/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
| 05/19/2023 | COT - RSPL - Plumbing Final | Passed | ||
| 05/19/2023 | COT - RSEL - Electrical Final | Passed |