Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Residential Building - One or Two Family
Address:
243 E 25TH ST 2
Address NEW:
243 E 25TH ST 2
Apply Date:
06/06/2022
Applicant:
Oscar Juarez
Description:
SFR

Permit Reviews

Permit Number - T22CM04179
Permit Status: Issued
Permit Description: SFR
Start Date Submittal Complete Date Status  
06/06/2022 RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO 07/01/2022 COMPLETED Review Details
07/19/2022 RESUBMITTAL 07/22/2022 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T22CM04179
Permit Status: Issued
Permit Description: SFR
Total Outstanding Activity Conditions - 1
Date Name
04/26/2024 Separate submittal to PC RWRD is required prior to final for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Outstanding Inspections

Permit Status: Issued
Permit Number: T22CM04179
Permite Description: SFR
Total Outstanding Inspections - 5
Last Inspection Date Description Inspector Results Comments
06/22/2022 COT - LCPL - Plumbing Intermediate N/A Canceled {Activity date: 06/22/2022; Status: Not Applicable; Inspector: KEN; Comment: Entered by KKARSEN1 - }
06/22/2022 RSME - Mechanical Progress N/A Canceled {Activity date: 06/22/2022; Status: Not Applicable; Inspector: KEN; Comment: Entered by KKARSEN1 - }
10/26/2022 COT - RSPL - Sewer N/A Not Ready
10/26/2022 COT - RSBU - Preslab N/A Not Ready
03/14/2023 COT - RSBU - Excavation/Rebar/Zoning N/A Not Ready No plans on site stopped inspection

Completed Inspections

Permit Status: Issued
Permit Number: T22CM04179
Permit Description: SFR
Total Completed Inspections - 17
Date Description Inspector Results Comments
03/06/2023 COT - RSPL - Rough Soil Passed Okay to backfill. Shading required.
03/06/2023 COT - RSPL - Sewer Passed Okay to backfill. Shading required.
03/16/2023 COT - RSBU - Preslab Passed
03/16/2023 COT - RSBU - Excavation/Rebar/Zoning Passed 3/16/2023 approved okay for concrete in footings.
03/16/2023 COT - RSEL - Grounding/Bonding Passed
04/10/2023 BULD - Electrical Clearance Passed Electrical panel is properly attached to structure and ground wire is connected to the ufer ground in concrete footing. Okay to energize panel from temporary construction power.
04/10/2023 COT - RSBU - Roof Nailing Passed Roof is properly nailed. Okay to dry in and apply roofing material.
04/10/2023 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed H2.5 clips are installed and properly nailed off.
04/10/2023 COT - RSEL - Construction Power Passed Panel is attached to building and connect ufer ground. Okay to energize panel.
04/21/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Approved. 4/21/2023
04/21/2023 COT - LCBU - Framing Passed Approved. 4/21/2023
04/21/2023 COT - RSPL - Yard Water Line Passed
05/19/2023 COT - RSME - Mechanical Final Passed
05/19/2023 RSBU - Building Final Passed
05/19/2023 COT - RSEL - Outdoor Lighting Passed
05/19/2023 COT - RSPL - Plumbing Final Passed
05/19/2023 COT - RSEL - Electrical Final Passed

Documents

File Name Document Type  
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
JOB CARD 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PLAN SET 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
PLAN SET.PDF DOCUMENTS VIEW