Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Needs Resubmittal
Type:
Residential Building - One or Two Family
Address:
201 W KENNEDY ST
Apply Date:
06/06/2022
Applicant:
Description:
NEW SFR BARRVIEJOB T19-M0097

Permit Reviews

Permit Number - T22CM04171
Permit Status: Needs resubmittal
Permit Description: NEW SFR BARRVIEJOB T19-M0097
Start Date Submittal Complete Date Status  
06/06/2022 RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO 07/22/2022 COMPLETED Review Details
07/22/2022 RESUBMITTAL 07/22/2022 COMPLETED Review Details
10/15/2022 REVISION - - 1ST 10/20/2022 COMPLETED Review Details
08/25/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 08/25/2023 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - T22CM04171
Permit Status: Needs resubmittal
Permit Description: NEW SFR BARRVIEJOB T19-M0097
Total Outstanding Activity Conditions - 2
Date Name
06/06/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
06/22/2022 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.

Conditions

Permit Number - T22CM04171
Permit Status: Needs resubmittal
Permit Description: NEW SFR BARRVIEJOB T19-M0097
Date Description Comments
10/20/2022 ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)

Outstanding Inspections

Permit Status: Needs Resubmittal
Permit Number: T22CM04171
Permite Description: NEW SFR BARRVIEJOB T19-M0097
Total Outstanding Inspections - 6
Last Inspection Date Description Inspector Results Comments
06/22/2022 COT - LCPL - Plumbing Intermediate N/A Canceled {Activity date: 06/22/2022; Status: Not Applicable; Inspector: KEN; Comment: Entered by KKARSEN1 - }
06/22/2022 RSME - Mechanical Progress N/A Canceled {Activity date: 06/22/2022; Status: Not Applicable; Inspector: KEN; Comment: Entered by KKARSEN1 - }
10/26/2022 COT - RSBU - Preslab N/A Not Ready
10/26/2022 COT - RSEL - Electrical Underground N/A Not Ready
10/26/2022 COT - RSPL - Sewer N/A Not Ready
10/26/2022 COT - RSPL - Rough Soil N/A Not Ready

Completed Inspections

Permit Status: Needs Resubmittal
Permit Number: T22CM04171
Permit Description: NEW SFR BARRVIEJOB T19-M0097
Total Completed Inspections - 20
Date Description Inspector Results Comments
09/15/2022 COT - RSBU - Excavation/Rebar/Zoning Passed {Activity date: 09/15/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Approved. Footings. Ok to place concrete in progress areas.

}
10/12/2022 COT - RSEL - Grounding/Bonding Passed {Activity date: 10/12/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved}
10/12/2022 COT - RSBU - Stem Wall/Retaining Wall Passed {Activity date: 10/12/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved}
12/21/2022 COT - RSBU - Masonry Pregrout Passed 3rd lift, final lift. okay to grout.
02/07/2023 COT - RSBU - Firewall/Fire Barrier/Firestop Passed
02/07/2023 COT - RSBU - Exterior Clips/Sheathing Passed
02/07/2023 COT - RSBU - Roof Nailing Passed
02/07/2023 COT - LCBU - Framing Passed
02/22/2023 COT - RSEL - Construction Power Passed
02/22/2023 BULD - Electrical Clearance Passed Approved, ECO Clearance to TEP required for construction power (dual meter pack)
03/22/2023 COT - RSPL - Yard Water Line Passed
03/22/2023 COT - RSPL - Gas Pressure Test Passed
03/22/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
04/12/2023 COT - HCBU - Interior Shear Bracing Passed
08/16/2023 COT - RSEL - Electrical Final Passed Electrical panel is labeled correctly, electrical fixtures and outlets are installed and operational. Fire alarm system is operational.
08/16/2023 COT - RSEL - Outdoor Lighting Passed Outside porch lights are installed and operational.
08/16/2023 COT - RSME - Mechanical Final Passed A/C units are installed and operational keeping house at 68 degrees.
08/16/2023 RSBU - Building Final Passed Mechanical, electrical, plumbing, and construction is complete. Okay to issue Certificate of Occupancy.
08/16/2023 COT - RSPL - Plumbing Final Passed Plumbing fixtures are installed and operational.
08/16/2023 COT - BULD - SWG Clearance Passed Gas pressure test was completed 3/22/23 by James B. Gas valve inspection was completed on 8/16/23. Okay to supply gas to the home.

Documents

File Name Document Type  
APPLICATION.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
SIC.PDF DOCUMENTS VIEW
SITE PLAN.PDF DOCUMENTS VIEW