Permit Details

Status:
Issued
Type:
Residential Building - One or Two Family
Address NEW:
962 W TETON ST Unit 1
Apply Date:
06/03/2022
Applicant:
Description:
DUPLEX SWDUPLEXM T20-M0002

Outstanding Activity Conditions

Permit Number - T22CM04169
Permit Status: Issued
Permit Description: DUPLEX SWDUPLEXM T20-M0002
Total Outstanding Activity Conditions - 4
Date Name
06/03/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
06/03/2022 ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)
07/12/2022 This building permit approval is without public sewer connection review or approval. It is strictly the responsibility of the owner and/or person doing the work to ensure that the appropriate review and approval to connect is obtained from Regional Wastewater Reclamation Department (RWRD) wastewater provider or Pima County DEQ approval of/and alternative disposal system. It is required that owner and/or person doing the work solicit all requisite approvals from the wastewater provider prior to obtaining this building construction permit. RWRD connection information is available at www.pima.gov/wwm/developer.htm
07/12/2022 PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE OF FINAL STATUS.

Outstanding Inspections

Permit Status: Issued
Permit Number: T22CM04169
Permite Description: DUPLEX SWDUPLEXM T20-M0002
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
10/27/2022 COT - RSPL - Plumbing Final N/A Not Ready

Completed Inspections

Permit Status: Issued
Permit Number: T22CM04169
Permit Description: DUPLEX SWDUPLEXM T20-M0002
Total Completed Inspections - 19
Date Description Inspector Results Comments
08/05/2022 COT - RSPL - Rough Soil Passed {Activity date: 08/05/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved for units 1 and 2, okay to cover}
08/09/2022 COT - RSEL - Grounding/Bonding Passed {Activity date: 08/09/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - approved}
08/09/2022 COT - RSBU - Preslab Passed {Activity date: 08/09/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - approved}
08/09/2022 COT - RSBU - Excavation/Rebar/Zoning Passed {Activity date: 08/09/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - approved}
09/07/2022 COT - RSBU - Roof Nailing Passed {Activity date: 09/07/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP}
09/07/2022 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed {Activity date: 09/07/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP}
09/21/2022 COT - LCBU - Framing Passed {Activity date: 09/21/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved} ; {Activity date: 09/07/2022; Status: Partial Approval; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - PA}
09/21/2022 COT - RSBU - Firewall/Fire Barrier/Firestop Passed {Activity date: 09/21/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved} ; {Activity date: 09/07/2022; Status: Denied; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - DE. Fire tape all joints and recall}
09/23/2022 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed {Activity date: 09/23/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved}
09/23/2022 COT - LCPL - Plumbing Intermediate Passed {Activity date: 09/23/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 09/22/2022; Status: Cancelled; Inspector: IVR USER; Comment: Entered by IVR USER - IVRS - AP canceled} ; {Activity date: 06/22/2022; Status: Not Applicable; Inspector: KEN; Comment: Entered by KKARSEN1 - }
09/23/2022 RSME - Mechanical Progress Passed {Activity date: 09/23/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 09/22/2022; Status: Cancelled; Inspector: IVR USER; Comment: Entered by IVR USER - IVRS - AP canceled} ; {Activity date: 06/22/2022; Status: Not Applicable; Inspector: KEN; Comment: Entered by KKARSEN1 - }
12/09/2022 COT - RSPL - Yard Water Line Passed
12/09/2022 COT - RSPL - Sewer Passed
12/09/2022 COT - RSEL - Construction Power Passed clearance for TEP ECO.
02/13/2023 COT - RSPL - Plumbing Final Passed all plumbing fixtures are installed and functional.
02/13/2023 COT - RSEL - Outdoor Lighting Passed unit 1 and unit 2 porch lights meet code requirements.
02/13/2023 RSBU - Building Final Passed Apartment units 1 & 2 are complete. Level 4 Certificate of Occupancy can be issued.
02/13/2023 COT - RSME - Mechanical Final Passed ac mechanical equipment is installed and functional. All registers are installed.
02/13/2023 COT - RSEL - Electrical Final Passed GFCI are installed in kitchen and bathrooms. AFCI breakers are installed in panel for bedrooms. Electric panel is properly marked.

Documents

File Name Document Type  
JOB CARD 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
MODEL MASTER APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
RESPONSE LETTER 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
SITE PLAN 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
MODEL MASTER APPLICATION.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
RESPONSE LETTER.PDF DOCUMENTS VIEW
SITE PLAN.PDF DOCUMENTS VIEW