Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Residential Building - One or Two Family
Apply Date:
06/02/2022
Applicant:
Philip Maguire
Description:
R - NEW 240V/200A RATING,SOLARREADY METER/MAIN COMBO.PANEL, SINGLE PHASE, WITH NEW 200A MAIN BRE

Permit Reviews

Permit Number - T22CM04119
Permit Status: Issued
Permit Description: R - NEW 240V/200A RATING,SOLARREADY METER/MAIN COMBO.PANEL, SINGLE PHASE, WITH NEW 200A MAIN BRE
Start Date Submittal Complete Date Status  
06/02/2022 OTHER 07/11/2022 COMPLETED Review Details
05/14/2024 RESIDENTIAL SOLAR v.1 05/14/2024 REQUIRES RESUBMIT Review Details
05/23/2024 RESIDENTIAL SOLAR v.1 06/12/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - T22CM04119
Permit Status: Issued
Permit Description: R - NEW 240V/200A RATING,SOLARREADY METER/MAIN COMBO.PANEL, SINGLE PHASE, WITH NEW 200A MAIN BRE
Total Outstanding Activity Conditions - 1
Date Name
07/09/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Conditions

Permit Number - T22CM04119
Permit Status: Issued
Permit Description: R - NEW 240V/200A RATING,SOLARREADY METER/MAIN COMBO.PANEL, SINGLE PHASE, WITH NEW 200A MAIN BRE
Date Description Comments
06/02/2022 THE INSTALLATION SHALL COMPLY WITH ALL APPLICABLE REQUIREMENTS OF SECTION 605.11.1 THROUGH 605.11.4 OF THE 2012 EDITION OF THE INTERNATIONAL FIRE CODE, THE INTERNATIONAL BUILDING CODE AND NFPA 70.

Outstanding Inspections

Permit Status: Issued
Permit Number: T22CM04119
Permite Description: R - NEW 240V/200A RATING,SOLARREADY METER/MAIN COMBO.PANEL, SINGLE PHASE, WITH NEW 200A MAIN BRE
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
10/27/2022 RSBU - Building Final N/A Not Ready
10/26/2022 COT - RSEL - Service Upgrade N/A Not Ready
10/27/2022 COT - RSEL - Electrical Final N/A Not Ready
05/16/2023 BULD - Electrical Clearance N/A Not Ready NR, no grounding or bonding present, no underground riser or mule tape in place. Please complete service panel installation for re-inspection

Documents

File Name Document Type  
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
JOB CARD 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PLANS 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-JOHN MARTIN ENGINEERING 03-28-24 (REV)_V1 (1)_V2_V3.PDF DOCUMENTS VIEW
NARRATIVE LETTER JOHN MARTIN_V1.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PLANS.PDF DOCUMENTS VIEW