Permit Details

Status:
Final
Type:
SOLAR WAIVER - RES
Apply Date:
05/31/2022
Applicant:
Technicians for Sustainability
Description:
R - roof mount 6.30 kW DC photovoltaic solar system; 15 AC modules, 2 branches, PV subpanel, 30A PV breaker on 200A bus (existing MLO load center), 200A MCB in meter main
Contractors:
  • Technicians for Sustainability

Permit Reviews

Permit Number - T22CM04108
Permit Status: Final
Permit Description: R - roof mount 6.30 kW DC photovoltaic solar system; 15 AC modules, 2 branches, PV subpanel, 30A PV breaker on 200A bus (existing MLO load center), 200A MCB in meter main
Start Date Submittal Complete Date Status  
05/31/2022 OTHER 07/15/2022 COMPLETED Review Details

Completed Inspections

Permit Status: Final
Permit Number: T22CM04108
Permit Description: R - roof mount 6.30 kW DC photovoltaic solar system; 15 AC modules, 2 branches, PV subpanel, 30A PV breaker on 200A bus (existing MLO load center), 200A MCB in meter main
Total Completed Inspections - 4
Date Description Inspector Results Comments
10/19/2022 TEP CLEARANCE - PM DQUINN Approved CODE DGC
10/19/2022 ELECTRIC - UNDERGROUND DQUINN Approved Ap
Underground conduits from main to guest house, ok to backfill.

Clear dgc
10/19/2022 BUILDING - FINAL DQUINN Approved Ap
10/19/2022 ELECTRIC - FINAL DQUINN Approved Ap

Close permit

Documents

File Name Document Type  
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
JOB CARD 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PLANS 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
SPECS 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
PLANS.PDF DOCUMENTS VIEW