Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Final
Type:
SOLAR WAIVER - RES
Apply Date:
05/31/2022
Applicant:
Sunrun Installation Services, Inc
Description:
R - SYSTEM SIZE: 3740W DC, 3840W AC - MODULES: (11) JA SOLAR: JAM60S10-340/MR - INVERTERS: (1) DELTA ELECTRONICS: E4-TL-US - RACKING: ; SOLLEGA FASTRACK510 WITH 304 STAINLESS STEEL HARDWARE - MAIN PANEL REPLACEMENT: EXISTING 100 AMP MAIN PANEL WITH 100 AMP MAIN BREAKER TO BE REPLACED WITH NEW 225 AMP MAIN PANEL WITH 200 AMP MAIN BREAKER. - RAPID SHUTDOWN: (11) APSMART RSD-S-PLC ROOFTOP MODULE LEVEL RAPID SHUTDOWN DEVICE
Architects:
  • Same as above
Contractors:
  • Sunrun Installation Services, Inc

Permit Reviews

Permit Number - T22CM04086
Permit Status: Final
Permit Description: R - SYSTEM SIZE: 3740W DC, 3840W AC - MODULES: (11) JA SOLAR: JAM60S10-340/MR - INVERTERS: (1) DELTA ELECTRONICS: E4-TL-US - RACKING: ; SOLLEGA FASTRACK510 WITH 304 STAINLESS STEEL HARDWARE - MAIN PANEL REPLACEMENT: EXISTING 100 AMP MAIN PANEL WITH 100 AMP MAIN BREAKER TO BE REPLACED WITH NEW 225 AMP MAIN PANEL WITH 200 AMP MAIN BREAKER. - RAPID SHUTDOWN: (11) APSMART RSD-S-PLC ROOFTOP MODULE LEVEL RAPID SHUTDOWN DEVICE
Start Date Submittal Complete Date Status  
05/31/2022 OTHER 07/15/2022 COMPLETED Review Details

Completed Inspections

Permit Status: Final
Permit Number: T22CM04086
Permit Description: R - SYSTEM SIZE: 3740W DC, 3840W AC - MODULES: (11) JA SOLAR: JAM60S10-340/MR - INVERTERS: (1) DELTA ELECTRONICS: E4-TL-US - RACKING: ; SOLLEGA FASTRACK510 WITH 304 STAINLESS STEEL HARDWARE - MAIN PANEL REPLACEMENT: EXISTING 100 AMP MAIN PANEL WITH 100 AMP MAIN BREAKER TO BE REPLACED WITH NEW 225 AMP MAIN PANEL WITH 200 AMP MAIN BREAKER. - RAPID SHUTDOWN: (11) APSMART RSD-S-PLC ROOFTOP MODULE LEVEL RAPID SHUTDOWN DEVICE
Total Completed Inspections - 4
Date Description Inspector Results Comments
08/09/2022 ELECTRIC - SERVICE UPGRADE DQUINN Approved Ap
Called TEP at 12:45

Need solar for final

Clear incr
08/15/2022 TEP CLEARANCE - PM TGAUSP Approved CODE DGC
08/15/2022 ELECTRIC - FINAL TGAUSP Approved Approved, please send DGC Clearance to TEP for the solar meter
08/15/2022 BUILDING - FINAL TGAUSP Approved Approved

Documents

File Name Document Type  
APPLICATION.PDF DOCUMENTS VIEW
GCL.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
PLAN SET.PDF DOCUMENTS VIEW
SPECIFICATION SHEETS.PDF DOCUMENTS VIEW
STRUCTURAL CALCS.PDF DOCUMENTS VIEW