Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T22CM04049
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
425 W PASEO REDONDO
Address NEW:
425 W PASEO REDONDO
Apply Date:
05/26/2022
Applicant:
Kyle Mitchell Mitchell
Description:
Interior remodel / renovation of existing hallways (levels 2-9) with new paint, flooring, lighting a
Permit Reviews
Permit Number - T22CM04049
Permit Status: Complete
Permit Description: Interior remodel / renovation of existing hallways (levels 2-9) with new paint, flooring, lighting a
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/26/2022 | COMMERCIAL - TI | 06/23/2022 | COMPLETED |
Outstanding Inspections
Permit Status: Complete
Permit Number: T22CM04049
Permite Description: Interior remodel / renovation of existing hallways (levels 2-9) with new paint, flooring, lighting a
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/05/2023 | BULD - Electrical Clearance | N/A | Not Applicable | |
| 10/05/2023 | COT - BULD - SWG Clearance | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: T22CM04049
Permit Description: Interior remodel / renovation of existing hallways (levels 2-9) with new paint, flooring, lighting a
Total Completed Inspections - 7
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/14/2023 | COT - LCEL - Electrical Intermediate | Passed | Hallway lighting in ceiling, all floors | |
| 04/14/2023 | COT - LCEL - Electrical Above Ceiling | Passed | ||
| 10/05/2023 | COT - LCEL - Electrical Final | Passed | 10/5/23: Level 2-9 hallways complete. A,B,C,D,E,G,H,I,K,L Level 2-9 rails complete. | |
| 10/05/2023 | COT - FCON - Alarm - Final | Passed | ||
| 10/05/2023 | COT - LCBU - Building Final | Passed | 10/5/23: Level 2-9 hallways complete. A,B,C,D,E,G,H,I,K,L Level 2-9 rails complete. | |
| 10/05/2023 | COT - FCON - Sprinkler - Final | Passed | ||
| 10/05/2023 | COT - FCON - Fire - Final | Passed |