Permit: T22CM04044
Permit Details
Apply Date:
05/26/2022
Applicant:
Paul Heese
Description:
NEW SFR BARRVIEJOB T19-M0097
Permit Reviews
Permit Number - T22CM04044
Permit Status: Needs resubmittal
Permit Description: NEW SFR BARRVIEJOB T19-M0097
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
05/26/2022 | RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO | 07/12/2022 | COMPLETED |
07/22/2022 | RESUBMITTAL | 07/22/2022 | COMPLETED |
10/15/2022 | REVISION - - 1ST | 10/20/2022 | COMPLETED |
08/25/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/25/2023 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - T22CM04044
Permit Status: Needs resubmittal
Permit Description: NEW SFR BARRVIEJOB T19-M0097
Total Outstanding Activity Conditions - 2
Date | Name |
---|---|
05/26/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
06/20/2022 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
Conditions
Permit Number - T22CM04044
Permit Status: Needs resubmittal
Permit Description: NEW SFR BARRVIEJOB T19-M0097
Date | Description | Comments |
---|---|---|
06/20/2022 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) |
Outstanding Inspections
Permit Status: Needs Resubmittal
Permit Number: T22CM04044
Permite Description: NEW SFR BARRVIEJOB T19-M0097
Total Outstanding Inspections - 4
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/26/2022 | COT - RSBU - Preslab | N/A | Not Ready | |
10/26/2022 | COT - RSEL - Electrical Underground | N/A | Not Ready | |
10/26/2022 | COT - RSPL - Sewer | N/A | Not Ready | |
10/26/2022 | COT - RSPL - Rough Soil | N/A | Not Ready |
Completed Inspections
Permit Status: Needs Resubmittal
Permit Number: T22CM04044
Permit Description: NEW SFR BARRVIEJOB T19-M0097
Total Completed Inspections - 23
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/15/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 09/15/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Approved. Footings. Ok to place concrete in progress areas.} | |
10/12/2022 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 10/12/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved} | |
10/12/2022 | COT - RSBU - Stem Wall/Retaining Wall | Passed | {Activity date: 10/12/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved} | |
12/21/2022 | COT - RSBU - Masonry Pregrout | Passed | 3rd lift. final lift, okay to grout. | |
02/07/2023 | COT - LCBU - Framing | Passed | ||
02/07/2023 | COT - RSBU - Roof Nailing | Passed | ||
02/07/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
02/07/2023 | COT - RSBU - Firewall/Fire Barrier/Firestop | Passed | ||
02/22/2023 | BULD - Electrical Clearance | Passed | Approved, ECO Clearance to TEP required for construction power (dual meter pack) | |
02/22/2023 | COT - RSEL - Construction Power | Passed | ||
03/22/2023 | COT - RSPL - Gas Pressure Test | Passed | ||
03/22/2023 | COT - LCPL - Plumbing Intermediate | Passed | ||
03/22/2023 | COT - HCBU - Interior Shear Bracing | Passed | ||
03/22/2023 | COT - RSPL - Yard Water Line | Passed | ||
03/22/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
08/16/2023 | COT - RSEL - Outdoor Lighting | Passed | Front and rear porch lights are operational. | |
08/16/2023 | COT - RSME - Mechanical Final | Passed | A/C equipment is operational and keeping home at 75 degrees. | |
08/16/2023 | COT - RSEL - Electrical Final | Passed | Electrical panel is properly labeled, electrical fixtures and outlets are installed and operational. Fire alarm is functioning properly. | |
08/16/2023 | RSBU - Building Final | Passed | Mechanical, electrical, plumbing, and construction are complete. Okay to issue Certificate of Occupancy for home. | |
08/16/2023 | COT - RSPL - Plumbing Final | Passed | Plumbing fixtures are installed and operational. | |
08/16/2023 | RSBU - Building Progress | Passed | ||
08/16/2023 | RSME - Mechanical Progress | Passed | ||
08/16/2023 | COT - BULD - SWG Clearance | Passed | Gas pressure test was completed 3/22/23 by James B. Gas valve inspection was completed on 8/16/23. Okay to supply gas to the home. |