Permit: T22CM04023
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
1310 E ELM ST UNIT 2
Address NEW:
1310 E ELM ST UNIT 2
Apply Date:
05/26/2022
Applicant:
Dennis Caldwell
Description:
SFR
Permit Reviews
Permit Number - T22CM04023
Permit Status: Complete
Permit Description: SFR
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/26/2022 | RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO | 07/12/2022 | COMPLETED |
| 07/12/2022 | RESUBMITTAL | 07/20/2022 | COMPLETED |
| 08/07/2022 | RESUBMITTAL | 08/10/2022 | COMPLETED |
| 08/10/2022 | RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO | 08/10/2022 | COMPLETED |
| 02/06/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 02/12/2025 | APPROVED |
Conditions
Permit Number - T22CM04023
Permit Status: Complete
Permit Description: SFR
| Date | Description | Comments |
|---|---|---|
| 08/10/2022 | This building permit approval is without public sewer connection review or approval. It is strictly the responsibility of the owner and/or person doing the work to ensure that the appropriate review and approval to connect is obtained from Regional Wastewater Reclamation Department (RWRD) wastewater provider or Pima County DEQ approval of/and alternative disposal system. It is required that owner and/or person doing the work solicit all requisite approvals from the wastewater provider prior to obtaining this building construction permit. RWRD connection information is available at www.pima.gov/wwm/developer.htm | |
| 08/10/2022 | PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE. | |
| 08/10/2022 | GCL or Owner/Builder Waiver required prior to permit issuance |
Outstanding Inspections
Permit Status: Complete
Permit Number: T22CM04023
Permite Description: SFR
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/26/2022 | COT - RSPL - Rough Soil | N/A | Not Ready | |
| 04/25/2023 | COT - LCBU - Framing | N/A | Not Ready | |
| 07/26/2023 | BULD - Electrical Clearance | N/A | Canceled | Canceled per contractor. 7/26/2023 |
| 03/25/2025 | COT - RSEL - Construction Power | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: T22CM04023
Permit Description: SFR
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/19/2022 | COT - LCPL - Plumbing Intermediate | Passed | {Activity date: 07/19/2022; Status: Not Applicable; Inspector: KEN; Comment: Entered by KKARSEN1 - } | |
| 07/19/2022 | RSME - Mechanical Progress | Passed | {Activity date: 07/19/2022; Status: Not Applicable; Inspector: KEN; Comment: Entered by KKARSEN1 - } | |
| 03/13/2023 | COT - RSPL - Sewer | Passed | Approved. Okay to backfill. Shading required. | |
| 03/13/2023 | COT - RSPL - Rough Soil | Passed | Approved. Okay to backfill. Shading required. | |
| 03/22/2023 | COT - RSBU - Preslab | Passed | okay for concrete placement | |
| 03/22/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 04/25/2023 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 04/27/2023 | COT - RSBU - Roof Nailing | Passed | ||
| 06/05/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Ok to insulate and Sheetrock. | |
| 06/05/2023 | COT - LCBU - Framing | Passed | Ok to Sheetrock and insulate. | |
| 06/20/2023 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 07/20/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
| 07/21/2023 | COT - BULD - SWG Clearance | Passed | Clearance for SWG unit 2 . 7/21/2023 | |
| 08/16/2023 | COT - RSPL - Plumbing Final | Passed | ||
| 08/16/2023 | COT - RSME - Mechanical Final | Passed | ||
| 08/16/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
| 08/16/2023 | COT - RSEL - Electrical Final | Passed | ||
| 08/16/2023 | RSBU - Building Final | Passed | ||
| 03/25/2025 | COT - RSPL - Gas Pressure Test | Passed | ||
| 03/25/2025 | COT - RSPL - Yard Water Line | Passed | ||
| 03/25/2025 | COT - RSEL - Electrical Underground | Passed |