Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Details

Status:
Complete
Type:
Commercial Building
Address:
4828 E 22ND ST
Address NEW:
4828 E 22ND ST
Apply Date:
05/25/2022
Applicant:
Mark Stouffer
Description:
Mechanical upgrade. Replacement of existing swamp coolers with air conditioning

Permit Reviews

Permit Number - T22CM04005
Permit Status: Complete
Permit Description: Mechanical upgrade. Replacement of existing swamp coolers with air conditioning
Start Date Submittal Complete Date Status  
05/25/2022 OTHER 06/23/2022 COMPLETED Review Details
12/31/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 12/31/2024 APPROVED Review Details
03/01/2023 COMMERCIAL PDSD SIMPLE REVIEW v.1 04/03/2023 APPROVED Review Details

Conditions

Permit Number - T22CM04005
Permit Status: Complete
Permit Description: Mechanical upgrade. Replacement of existing swamp coolers with air conditioning
Date Description Comments
04/03/2023 AIR BALANCING REPORT IS REQUIRED.

Completed Inspections

Permit Status: Complete
Permit Number: T22CM04005
Permit Description: Mechanical upgrade. Replacement of existing swamp coolers with air conditioning
Total Completed Inspections - 7
Date Description Inspector Results Comments
05/13/2024 COT - LCPL - Gas Pressure Test Passed Gas line is installed from meter to roof equipment, all piping is properly supported and secured to the exterior wall of building. New gas line is under 15# of compressed air with no leaks. Okay to proceed with connecting gas line meter.
05/17/2024 COT - LCPL - Plumbing Final Passed
05/21/2024 BULD - Electrical Clearance Passed TEP INCR
05/29/2024 COT - LCEL - Electrical Final Passed
07/02/2024 COT - LCEL - Electrical Progress Passed
07/02/2024 COT - LCME - Mechanical Intermediate Passed
07/02/2024 COT - LCME - Mechanical Final Passed