Permit: T22CM03981
Permit Details
Apply Date:
05/25/2022
Applicant:
Sunrun Installation Services, Inc
Description:
R - SYSTEM SIZE: 7290W DC, 5220W AC - MODULES: (18) REC SOLAR: REC405AA PURE - INVERTERS: (18) ENPHASE ENERGY: IQ8PLUS-72-2-US - RACKING: ; 1-HOLE BASE WITH TILT KIT: SEE UR40-D11 - MAIN PANEL REPLACEMENT: EXISTING 100 AMP MAIN PANEL WITH None - Hot Bu AMP MAIN BREAKER TO BE REPLACED WITH NEW 225 AMP MAIN PANEL WITH 200 AMP MAIN BREAKER.
Architects:
- Same as above
Contractors:
- Sunrun Installation Services, Inc
Completed Inspections
Permit Status: Final
Permit Number: T22CM03981
Permit Description: R - SYSTEM SIZE: 7290W DC, 5220W AC
- MODULES: (18) REC SOLAR: REC405AA PURE
- INVERTERS: (18) ENPHASE ENERGY: IQ8PLUS-72-2-US
- RACKING: ; 1-HOLE BASE WITH TILT KIT: SEE UR40-D11
- MAIN PANEL REPLACEMENT: EXISTING 100 AMP MAIN
PANEL WITH None - Hot Bu AMP MAIN BREAKER TO BE
REPLACED WITH NEW 225 AMP MAIN PANEL WITH 200 AMP
MAIN BREAKER.
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/02/2022 | ELECTRIC - SERVICE UPGRADE | TGAUSP | Approved | Approved, INCR Clearance was called into TEP at 10:30am (power-kill) |
| 08/08/2022 | TEP CLEARANCE - PM | TGAUSP | Approved | CODE DGC |
| 08/08/2022 | RESIDENTIAL INTERMEDIATE | TGAUSP | Approved | Approved 1090 |
| 08/08/2022 | ELECTRIC - FINAL | TGAUSP | Approved | Approved, please send DGC Clearance to TEP for the solar meter |
| 08/08/2022 | BUILDING - FINAL | TGAUSP | Approved | Approved |