Permit: T22CM03846
Permit Details
Apply Date:
05/19/2022
Applicant:
Rosebelle Ann Sanoria
Description:
R - Installation of 22.00KW PV System/MPU 200A
Permit Reviews
Permit Number - T22CM03846
Permit Status: Issued
Permit Description: R - Installation of 22.00KW PV System/MPU 200A
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
05/19/2022 | OTHER | 07/08/2022 | COMPLETED |
07/26/2022 | REVISION - - 1ST | 09/02/2022 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T22CM03846
Permit Status: Issued
Permit Description: R - Installation of 22.00KW PV System/MPU 200A
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
07/08/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Conditions
Permit Number - T22CM03846
Permit Status: Issued
Permit Description: R - Installation of 22.00KW PV System/MPU 200A
Date | Description | Comments |
---|---|---|
05/19/2022 | THE INSTALLATION SHALL COMPLY WITH ALL APPLICABLE REQUIREMENTS OF SECTION 605.11.1 THROUGH 605.11.4 OF THE 2012 EDITION OF THE INTERNATIONAL FIRE CODE, THE INTERNATIONAL BUILDING CODE AND NFPA 70. |
Outstanding Inspections
Permit Status: Issued
Permit Number: T22CM03846
Permite Description: R - Installation of 22.00KW PV System/MPU 200A
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/26/2022 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Not Ready |
Completed Inspections
Permit Status: Issued
Permit Number: T22CM03846
Permit Description: R - Installation of 22.00KW PV System/MPU 200A
Total Completed Inspections - 4
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/17/2022 | PDSD Building Division - TEP PM Clearance | Passed | {Activity date: 10/17/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by VVERA1 - CODE INCR} | |
10/17/2022 | COT - RSEL - Service Upgrade | Passed | {Activity date: 10/17/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by VVERA1 - Ap Called TEP at 12:12 Clear incr Need solar for final } |
|
12/23/2022 | RSBU - Building Final | Passed | ||
12/23/2022 | COT - RSEL - Electrical Final | Passed |