Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T22CM03819
Permit Details
Status:
Inspections Complete
Type:
Residential Building - One or Two Family
Address:
749 S GRANITE FALLS DR
Apply Date:
05/19/2022
Applicant:
Philip Maguire
Description:
R - NEW 240V/200A RATING, SOLARREADY METER/MAIN COMBO.PANEL (US2: MC4040S1200SC) , SINGLE PHASE
Permit Reviews
Permit Number - T22CM03819
Permit Status: Inspections complete
Permit Description: R - NEW 240V/200A RATING, SOLARREADY METER/MAIN COMBO.PANEL (US2: MC4040S1200SC) , SINGLE PHASE
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
05/19/2022 | OTHER | 07/12/2022 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T22CM03819
Permit Status: Inspections complete
Permit Description: R - NEW 240V/200A RATING, SOLARREADY METER/MAIN COMBO.PANEL (US2: MC4040S1200SC) , SINGLE PHASE
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
07/12/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Conditions
Permit Number - T22CM03819
Permit Status: Inspections complete
Permit Description: R - NEW 240V/200A RATING, SOLARREADY METER/MAIN COMBO.PANEL (US2: MC4040S1200SC) , SINGLE PHASE
Date | Description | Comments |
---|---|---|
05/19/2022 | THE INSTALLATION SHALL COMPLY WITH ALL APPLICABLE REQUIREMENTS OF SECTION 605.11.1 THROUGH 605.11.4 OF THE 2012 EDITION OF THE INTERNATIONAL FIRE CODE, THE INTERNATIONAL BUILDING CODE AND NFPA 70. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: T22CM03819
Permit Description: R - NEW 240V/200A RATING, SOLARREADY METER/MAIN COMBO.PANEL (US2: MC4040S1200SC) , SINGLE PHASE
Total Completed Inspections - 4
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/20/2023 | COT - RSEL - Service Upgrade | Passed | TEP INCR | |
03/30/2023 | COT - RSEL - Electrical Final | Passed | ||
03/30/2023 | RSBU - Building Final | Passed | ||
06/26/2023 | BULD - Electrical Clearance | Passed | pass |