Description:
TI: Offices and two ADA Toilets within an existing Warehouse

Permit Reviews

Permit Number - T22CM03750
Permit Status: Issued
Permit Description: TI: Offices and two ADA Toilets within an existing Warehouse
Start Date Submittal Complete Date Status  
05/17/2022 3RD PARTY REVIEW - COMMERCIAL TI 07/06/2022 COMPLETED Review Details
01/06/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 01/18/2023 APPROVED Review Details

Conditions

Permit Number - T22CM03750
Permit Status: Issued
Permit Description: TI: Offices and two ADA Toilets within an existing Warehouse
Date Description Comments
06/23/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
06/23/2022 SHOP DRAWINGS REQUIRED FOR AUTOMATIC FIRE SPRINKLERS.

Outstanding Inspections

Permit Status: Issued
Permit Number: T22CM03750
Permite Description: TI: Offices and two ADA Toilets within an existing Warehouse
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
10/26/2022 COT - LCEL - Grounding/Bonding N/A Not Ready

Completed Inspections

Permit Status: Issued
Permit Number: T22CM03750
Permit Description: TI: Offices and two ADA Toilets within an existing Warehouse
Total Completed Inspections - 21
Date Description Inspector Results Comments
07/21/2022 COT - LCPL - Rough Soil Passed {Activity date: 07/21/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - approved. Okay to backfill.}
07/21/2022 COT - LCME - Mechanical Intermediate Passed {Activity date: 07/21/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - approved. All hard duct installed, insulated and supported.}
07/25/2022 COT - LCBU - Preslab Passed {Activity date: 07/25/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved, okay for concrete placement} ; {Activity date: 07/21/2022; Status: Partial Approval; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - partial. Backfill, wrap pipes. Re call in for inspection}
08/11/2022 COT - LCEL - Electrical Intermediate Passed {Activity date: 08/11/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - Approved}
08/11/2022 COT - LCBU - Framing Passed {Activity date: 08/11/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Approved}
08/11/2022 COT - LCPL - Plumbing Intermediate Passed {Activity date: 08/11/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - Approved}
08/18/2022 COT - HCBU - Interior Shear Bracing Passed {Activity date: 08/18/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved for all walls and restroom lids}
09/29/2022 COT - LCBU - Building Above Ceiling Passed {Activity date: 09/29/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved}
09/29/2022 COT - LCME - Mechanical Above Ceiling Passed {Activity date: 09/29/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved}
09/29/2022 COT - LCPL - Plumbing Above Ceiling Passed {Activity date: 09/29/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved}
09/29/2022 COT - LCEL - Electrical Above Ceiling Passed {Activity date: 09/29/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved}
11/07/2022 COT - HCEL - Service Upgrade Passed New 400A service, ECO to TEP required
10/26/2022 COT - FCON - Sprinkler - Final Passed
10/26/2022 COT - FCON - Fire - Final Passed
12/14/2022 COT - LCEL - Electrical Underground Passed N/A
12/14/2022 COT - HCEL - Grounding/Bonding Passed
12/14/2022 COT - LCEL - Electrical Final Passed
12/14/2022 COT - LCPL - Plumbing Final Passed
12/15/2022 COT - FCON - Alarm - Final Passed
12/22/2022 COT - LCBU - Building Final Passed
12/22/2022 COT - LCME - Mechanical Final Passed

Documents

File Name Document Type  
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
CALCS_MECH 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
CALCS_STRUCT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
COMMERCIAL SUBMITTAL CHECKLIST 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
GCL 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
JOB CARD 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PLAN SET 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PSA_STANTEC 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
CALCS_MECH.PDF DOCUMENTS VIEW
CALCS_STRUCT.PDF DOCUMENTS VIEW
COMMERCIAL SUBMITTAL CHECKLIST.PDF DOCUMENTS VIEW
GCL.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
PSA_STANTEC.PDF DOCUMENTS VIEW
PLAN SET.PDF DOCUMENTS VIEW
MILLER SALES - ENGINEERING TI - REPORT_V1.PDF DOCUMENTS VIEW
MILLER SALES - ENGINEERING TI FLOOR PLAN_V1.PDF DOCUMENTS VIEW