Permit: T22CM03612
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
2790 W BLACK CLOUD CT
Address NEW:
2790 W BLACK CLOUD CT
Apply Date:
05/11/2022
Applicant:
Andrew Christopher
Description:
SFR
Permit Reviews
Permit Number - T22CM03612
Permit Status: Complete
Permit Description: SFR
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/11/2022 | RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO | 06/21/2022 | COMPLETED |
| 08/26/2022 | RESUBMITTAL | 09/21/2022 | COMPLETED |
| 10/20/2022 | REVISION - - 1ST | 10/20/2022 | ACTIVE |
| 01/12/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 02/03/2023 | APPROVED |
| 11/01/2022 | RESIDENTIAL NEW DWELLING v.1 | 11/22/2022 | APPROVED |
| 03/30/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/08/2023 | APPROVED |
Conditions
Permit Number - T22CM03612
Permit Status: Complete
Permit Description: SFR
| Date | Description | Comments |
|---|---|---|
| 09/21/2022 | This building permit approval is without public sewer connection review or approval. It is strictly the responsibility of the owner and/or person doing the work to ensure that the appropriate review and approval to connect is obtained from Regional Wastewater Reclamation Department (RWRD) wastewater provider or Pima County DEQ approval of/and alternative disposal system. It is required that owner and/or person doing the work solicit all requisite approvals from the wastewater provider prior to obtaining this building construction permit. RWRD connection information is available at www.pima.gov/wwm/developer.htm | |
| 09/21/2022 | General Contractor Letter (GCL) or Owner/Builder Waiver required prior to permit issuance | |
| 09/21/2022 | A Pima County Wastewater sign off required prior to issuance of permit. | |
| 11/14/2022 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 02/03/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: T22CM03612
Permite Description: SFR
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/20/2022 | COT - LCPL - Plumbing Intermediate | N/A | Canceled | {Activity date: 10/20/2022; Status: Not Applicable; Inspector: KEN; Comment: Entered by KKARSEN1 - } |
| 10/20/2022 | RSME - Mechanical Progress | N/A | Canceled | {Activity date: 10/20/2022; Status: Not Applicable; Inspector: KEN; Comment: Entered by KKARSEN1 - } |
| 10/26/2022 | COT - FCON - Sprinkler - Final | N/A | Not Ready |
Completed Inspections
Permit Status: Complete
Permit Number: T22CM03612
Permit Description: SFR
Total Completed Inspections - 18
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/10/2022 | COT - RSPL - Yard Water Line | Passed | ||
| 11/17/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Post tension slab foundation - Special Inspection | |
| 11/17/2022 | COT - RSEL - Grounding/Bonding | Passed | Ufer ground | |
| 11/17/2022 | COT - RSBU - Preslab | Passed | Post tension slab foundation - Special Inspection | |
| 12/15/2022 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 12/16/2022 | COT - RSBU - Roof Nailing | Passed | ||
| 12/20/2022 | COT - RSPL - Sewer | Passed | HCS connection is tied in to septic tank. tracer wire is in and secured. | |
| 12/20/2022 | COT - RSPL - Rough Soil | Passed | HCS connection has been done. tracer wire is in and secured. | |
| 01/13/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 01/13/2023 | COT - LCBU - Framing | Passed | ||
| 01/26/2023 | COT - HCBU - Interior Shear Bracing | Passed | ||
| 02/06/2023 | COT - RSEL - Construction Power | Passed | ||
| 02/06/2023 | COT - RSEL - Electrical Underground | Passed | conduits are 36”below grade. connected to transformer and panel box with sweeps. | |
| 04/19/2023 | COT - RSEL - Electrical Final | Passed | N/A duplicate inspection. | |
| 04/19/2023 | COT - RSME - Mechanical Final | Passed | ||
| 05/17/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
| 05/17/2023 | COT - RSPL - Plumbing Final | Passed | Approved. Corrections have been made. Duplicate inspection. 5/17/2023 | |
| 05/17/2023 | RSBU - Building Final | Passed | Approved. Corrections have been made. Duplicate inspection. 5/17/2023 |