Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Commercial Building
Address:
5344 S 12TH AV
Apply Date:
05/10/2022
Applicant:
Philip Veneziano
Description:
Removing existing evaporative coolers and replacing with new AC units

Permit Reviews

Permit Number - T22CM03589
Permit Status: Inspections complete
Permit Description: Removing existing evaporative coolers and replacing with new AC units
Start Date Submittal Complete Date Status  
05/10/2022 3RD PARTY REVIEW - COMMERCIAL TI 07/01/2022 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T22CM03589
Permit Status: Inspections complete
Permit Description: Removing existing evaporative coolers and replacing with new AC units
Total Outstanding Activity Conditions - 1
Date Name
06/30/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: T22CM03589
Permite Description: Removing existing evaporative coolers and replacing with new AC units
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
10/07/2024 COT - LCME - Mechanical Above Ceiling N/A Re-inspection required 10/4/24: no answer no access

Completed Inspections

Permit Status: Inspections Complete
Permit Number: T22CM03589
Permit Description: Removing existing evaporative coolers and replacing with new AC units
Total Completed Inspections - 10
Date Description Inspector Results Comments
04/09/2024 BULD - Electrical Clearance Passed
11/22/2024 COT - LCME - Mechanical Above Ceiling Passed
11/22/2024 COT - LCEL - Electrical Intermediate Passed
11/22/2024 COT - LCPL - Plumbing Final Passed
11/22/2024 COT - LCME - Mechanical Intermediate Passed
11/22/2024 COT - LCME - Mechanical Final Passed
11/22/2024 COT - LCEL - Electrical Final Passed
11/22/2024 COT - LCPL - Plumbing Intermediate Passed
11/22/2024 COT - LCEL - Electrical Above Ceiling Passed
11/22/2024 COT - LCBU - Building Final Passed

Documents

File Name Document Type  
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
COMCHECK 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
JOB CARD 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
MECHANICAL CALCS 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PLAN SET 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PSA_STANTEC 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
COMCHECK.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
MECHANICAL CALCS.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
PLAN SET.PDF DOCUMENTS VIEW
PSA_STANTEC.PDF DOCUMENTS VIEW