Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address NEW:
2805 S PARK AV BLDG 84
Apply Date:
05/10/2022
Applicant:
burak bekat
Description:
SFR BRIOS1432 T20-M0059

Permit Reviews

Permit Number - T22CM03555
Permit Status: Complete
Permit Description: SFR BRIOS1432 T20-M0059
Start Date Submittal Complete Date Status  
05/10/2022 OTHER 07/06/2022 COMPLETED Review Details
02/28/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 02/28/2024 REQUIRES RESUBMIT Review Details
02/06/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 02/06/2024 APPROVED Review Details
03/04/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.2 03/11/2024 APPROVED Review Details

Conditions

Permit Number - T22CM03555
Permit Status: Complete
Permit Description: SFR BRIOS1432 T20-M0059
Date Description Comments
05/10/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
05/10/2022 SPECIAL INSPECTION FORMS AND REPORTS REQUIRED PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY.
05/10/2022 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
07/06/2022 This building permit approval is without public sewer connection review or approval. It is strictly the responsibility of the owner and/or person doing the work to ensure that the appropriate review and approval to connect is obtained from Regional Wastewater Reclamation Department (RWRD) wastewater provider or Pima County DEQ approval of/and alternative disposal system. It is required that owner and/or person doing the work solicit all requisite approvals from the wastewater provider prior to obtaining this building construction permit. RWRD connection information is available at www.pima.gov/wwm/developer.htm
02/28/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
02/28/2024 Water Meter Size
07/06/2022 PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE OF FINAL STATUS.
02/28/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
02/28/2024 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.
02/28/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: T22CM03555
Permite Description: SFR BRIOS1432 T20-M0059
Total Outstanding Inspections - 8
Last Inspection Date Description Inspector Results Comments
10/26/2022 COT - RSEL - Grounding/Bonding N/A Not Ready
10/26/2022 COT - RSBU - Preslab N/A Not Ready
10/26/2022 COT - RSBU - Excavation/Rebar/Zoning N/A Not Ready
12/01/2023 COT - RSEL - Construction Power N/A Not Applicable
12/01/2023 COT - RSBU - Sustainability N/A Not Applicable
10/27/2022 COT - RSPL - Plumbing Final N/A Not Ready
12/04/2023 ENGR Engineering Final N/A Canceled Called in by mistake
12/21/2023 RSBU - Building Final N/A Not Ready

Completed Inspections

Permit Status: Complete
Permit Number: T22CM03555
Permit Description: SFR BRIOS1432 T20-M0059
Total Completed Inspections - 17
Date Description Inspector Results Comments
10/13/2022 COT - RSPL - Rough Soil Passed {Activity date: 10/13/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved}
11/14/2022 COT - RSBU - Roof Nailing Passed
04/26/2023 RSME - Mechanical Progress Passed
04/26/2023 RSEL - Electrical Progress Passed
04/26/2023 COT - LCBU - Framing Passed
05/17/2023 COT - HCBU - Interior Shear Bracing Passed
10/04/2023 BULD - Electrical Clearance Passed 10/4/23 clearance ECO
12/01/2023 COT - LCPL - Plumbing Intermediate Passed
12/01/2023 COT - RSPL - Yard Water Line Passed
12/01/2023 COT - RSEL - Electrical Underground Passed
12/01/2023 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
12/01/2023 COT - RSPL - Sewer Passed
12/04/2023 COT - RSME - Mechanical Final Passed
12/04/2023 COT - RSPL - Plumbing Final Passed
12/21/2023 COT - RSEL - Electrical Final Passed
02/13/2024 ENGR Engineering Final Passed
02/20/2024 RSBU - Building Final Passed OK for CofO