Permit: T22CM03552
Permit Details
Apply Date:
05/10/2022
Applicant:
ramon polanco
Description:
SFR BRIO1432 T20-M0058
Permit Reviews
Permit Number - T22CM03552
Permit Status: Complete
Permit Description: SFR BRIO1432 T20-M0058
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
05/10/2022 | OTHER | 07/06/2022 | COMPLETED |
03/04/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 03/11/2024 | APPROVED |
02/28/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 02/28/2024 | REQUIRES RESUBMIT |
02/06/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 02/06/2024 | APPROVED |
Conditions
Permit Number - T22CM03552
Permit Status: Complete
Permit Description: SFR BRIO1432 T20-M0058
Date | Description | Comments |
---|---|---|
05/10/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. | |
05/10/2022 | SPECIAL INSPECTION FORMS AND REPORTS REQUIRED PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY. | |
05/10/2022 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. | |
07/06/2022 | This building permit approval is without public sewer connection review or approval. It is strictly the responsibility of the owner and/or person doing the work to ensure that the appropriate review and approval to connect is obtained from Regional Wastewater Reclamation Department (RWRD) wastewater provider or Pima County DEQ approval of/and alternative disposal system. It is required that owner and/or person doing the work solicit all requisite approvals from the wastewater provider prior to obtaining this building construction permit. RWRD connection information is available at www.pima.gov/wwm/developer.htm | |
02/28/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
02/28/2024 | Water Meter Size | |
07/06/2022 | PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE OF FINAL STATUS. | |
02/28/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
02/28/2024 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. | |
02/28/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: T22CM03552
Permite Description: SFR BRIO1432 T20-M0058
Total Outstanding Inspections - 4
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/26/2022 | COT - RSEL - Grounding/Bonding | N/A | Not Ready | |
10/26/2022 | COT - RSBU - Preslab | N/A | Not Ready | |
10/26/2022 | COT - RSBU - Excavation/Rebar/Zoning | N/A | Not Ready | |
11/30/2023 | RSBU - Building Final | N/A | Partial Pass | Partial pending other inspections. 11/30/2023 |
Completed Inspections
Permit Status: Complete
Permit Number: T22CM03552
Permit Description: SFR BRIO1432 T20-M0058
Total Completed Inspections - 19
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/13/2022 | COT - RSPL - Rough Soil | Passed | {Activity date: 10/13/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved} | |
11/18/2022 | COT - RSBU - Roof Nailing | Passed | ||
04/27/2023 | COT - LCBU - Framing | Passed | ||
04/27/2023 | COT - LCPL - Plumbing Intermediate | Passed | ||
04/27/2023 | RSEL - Electrical Progress | Passed | ||
04/27/2023 | RSME - Mechanical Progress | Passed | ||
05/08/2023 | COT - HCBU - Interior Shear Bracing | Passed | ||
10/03/2023 | BULD - Electrical Clearance | Passed | 10/3/23 Clearance ECO | |
11/30/2023 | COT - RSME - Mechanical Final | Passed | ||
11/30/2023 | COT - RSEL - Electrical Underground | Passed | Duplicate inspection. 11/30/2023 | |
11/30/2023 | COT - RSBU - Sustainability | Passed | ||
11/30/2023 | COT - RSEL - Electrical Final | Passed | ||
11/30/2023 | COT - RSPL - Yard Water Line | Passed | Duplicate inspection. 11/30/2023 | |
11/30/2023 | COT - RSPL - Plumbing Final | Passed | ||
11/30/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
11/30/2023 | COT - RSPL - Sewer | Passed | Duplicate inspection. 11/30/2023 | |
11/30/2023 | COT - RSEL - Construction Power | Passed | Duplicate inspection. 11/30/2023 | |
02/13/2024 | ENGR Engineering Final | Passed | ||
02/21/2024 | RSBU - Building Final | Passed | Ok for CofO |