Permit Details

Status:
Issued
Type:
Commercial Building
Apply Date:
05/10/2022
Applicant:
Description:
Remodel Chemistry Lab

Permit Reviews

Permit Number - T22CM03542
Permit Status: Issued
Permit Description: Remodel Chemistry Lab
Start Date Submittal Complete Date Status  
05/10/2022 3RD PARTY REVIEW - COMMERCIAL TI 06/29/2022 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T22CM03542
Permit Status: Issued
Permit Description: Remodel Chemistry Lab
Total Outstanding Activity Conditions - 6
Date Name
06/29/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
06/29/2022 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
06/29/2022 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
06/29/2022 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
06/29/2022 SHOP DRAWINGS REQUIRED FOR AUTOMATIC FIRE SPRINKLERS.
06/29/2022 SHOP DRAWINGS REQUIRED FOR FIRE ALARM.

Outstanding Inspections

Permit Status: Issued
Permit Number: T22CM03542
Permite Description: Remodel Chemistry Lab
Total Outstanding Inspections - 8
Last Inspection Date Description Inspector Results Comments
10/27/2022 COT - LCPL - Plumbing Intermediate N/A Not Ready
10/26/2022 COT - LCEL - Electrical Intermediate N/A Not Ready
10/27/2022 COT - LCBU - Framing N/A Not Ready
10/26/2022 COT - LCPL - Rough Soil N/A Not Ready
10/26/2022 COT - FCON - Alarm - Final N/A Not Ready
10/26/2022 COT - FCON - Fire - Final N/A Not Ready
10/26/2022 COT - FCON - Sprinkler - Final N/A Not Ready
01/24/2023 COT - BULD - SWG Clearance N/A Not Applicable

Completed Inspections

Permit Status: Issued
Permit Number: T22CM03542
Permit Description: Remodel Chemistry Lab
Total Completed Inspections - 17
Date Description Inspector Results Comments
07/05/2022 COT - LCEL - Electrical Underground Passed {Activity date: 07/05/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by NGARCIA3 - Ap
All under slab conduit ok to backfill.}
12/30/2022 COT - LCPL - Plumbing Intermediate Passed
12/30/2022 COT - LCEL - Electrical Intermediate Passed
12/30/2022 COT - LCBU - Framing Passed
12/30/2022 COT - LCPL - Rough Soil Passed
12/30/2022 COT - LCPL - Gas Pressure Test Passed
12/30/2022 COT - LCME - Mechanical Intermediate Passed
12/30/2022 COT - LCBU - Masonry Pregrout Passed n/a
12/30/2022 COT - LCPL - Plumbing Above Ceiling Passed
12/30/2022 COT - LCME - Kitchen Hood Passed
12/30/2022 COT - LCME - Mechanical Above Ceiling Passed
12/30/2022 COT - FCON - Fire - Final Passed
12/30/2022 COT - LCBU - Preslab Passed
01/24/2023 COT - LCPL - Plumbing Final Passed
01/24/2023 COT - LCME - Mechanical Final Passed
01/24/2023 COT - LCBU - Building Above Ceiling Passed
01/24/2023 COT - LCBU - Building Final Passed

Documents

File Name Document Type  
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
GCL 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
JOB CARD 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PLAN SET 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PSA 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
SIC 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
STRUCTURAL CALCULATIONS 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
GCL.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
PLAN SET.PDF DOCUMENTS VIEW
PSA.PDF DOCUMENTS VIEW
SIC.PDF DOCUMENTS VIEW
STRUCTURAL CALCULATIONS.PDF DOCUMENTS VIEW