Permit Details

Status:
Issued
Type:
Residential Building - One or Two Family
Address:
2629 N MARTIN AV
Address NEW:
2629 N MARTIN AV
Apply Date:
05/09/2022
Applicant:
Sharayah Jimenez
Description:
STUDIO RESIDENCE

Permit Reviews

Permit Number - T22CM03517
Permit Status: Issued
Permit Description: STUDIO RESIDENCE
Start Date Submittal Complete Date Status  
05/09/2022 RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO 05/27/2022 COMPLETED Review Details
06/28/2022 RESUBMITTAL 08/10/2022 COMPLETED Review Details
04/04/2024 RESIDENTIAL NEW DWELLING v.1 05/03/2024 APPROVED Review Details

Conditions

Permit Number - T22CM03517
Permit Status: Issued
Permit Description: STUDIO RESIDENCE
Date Description Comments
08/10/2022 This building permit approval is without public sewer connection review or approval. It is strictly the responsibility of the owner and/or person doing the work to ensure that the appropriate review and approval to connect is obtained from Regional Wastewater Reclamation Department (RWRD) wastewater provider or Pima County DEQ approval of/and alternative disposal system. It is required that owner and/or person doing the work solicit all requisite approvals from the wastewater provider prior to obtaining this building construction permit. RWRD connection information is available at www.pima.gov/wwm/developer.htm
08/10/2022 GCL or Owner/Builder Waiver required prior to permit issuance
08/10/2022 PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE OF PERMIT.

Outstanding Inspections

Permit Status: Issued
Permit Number: T22CM03517
Permite Description: STUDIO RESIDENCE
Total Outstanding Inspections - 6
Last Inspection Date Description Inspector Results Comments
07/06/2022 COT - LCPL - Plumbing Intermediate N/A Canceled {Activity date: 07/06/2022; Status: Not Applicable; Inspector: KEN; Comment: Entered by KKARSEN1 - }
07/06/2022 RSME - Mechanical Progress N/A Canceled {Activity date: 07/06/2022; Status: Not Applicable; Inspector: KEN; Comment: Entered by KKARSEN1 - }
05/01/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Canceled
10/26/2022 COT - RSPL - Yard Water Line N/A Not Ready
01/25/2023 COT - RSPL - Sewer N/A Partial Pass sewer lines are stubbed out 2’ from building.
03/27/2024 COT - RSEL - Electrical Final N/A Not Ready

Completed Inspections

Permit Status: Issued
Permit Number: T22CM03517
Permit Description: STUDIO RESIDENCE
Total Completed Inspections - 18
Date Description Inspector Results Comments
01/25/2023 COT - RSBU - Preslab Passed pre slab is compacted ready for concrete pour.
01/25/2023 COT - RSEL - Construction Power Passed
01/25/2023 COT - RSBU - Excavation/Rebar/Zoning Passed rebar and footing trenches meet plans.
01/25/2023 COT - RSPL - Rough Soil Passed underground plumbing per plans.
01/25/2023 COT - RSEL - Grounding/Bonding Passed ufer ground complete
03/29/2023 COT - RSBU - Roof Nailing Passed Roof Nailing is complete. Okay to dry in and install roofing.
03/29/2023 COT - LCBU - Framing Passed Rough in framing is complete. Okay to insulate and sheet rock after electrical work is completed.
03/29/2023 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed Shear walls and H2.5 clips are properly installed.
06/07/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Mechanical, electrical, and plumbing rough-in is complete. Okay to sheet rock, tape, texture, and paint interior walls.
11/22/2023 COT - RSEL - Electrical Underground Passed
01/04/2024 BULD - Electrical Clearance Passed Clearance for TEP ECO. 1/4/2024
02/05/2024 COT - RSPL - Yard Water Line Passed Water line is connected to meter and has tracer wire installed. Okay to shade and backfill trench.
02/05/2024 COT - RSPL - Sewer Passed Underground plumbing is connected to main sewer line and under water test with no leaks. Tracer wire is installed from clean-outs to sewer tap. Okay to shade pipe and backfill trench.
04/02/2024 COT - RSEL - Electrical Final Passed
04/02/2024 RSBU - Building Final Passed
04/02/2024 COT - RSPL - Plumbing Final Passed
04/02/2024 COT - RSME - Mechanical Final Passed
04/02/2024 COT - RSEL - Outdoor Lighting Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-220621 CASITA MARTIN 100 CD REVISED_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
PLAN SET.PDF DOCUMENTS VIEW