Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Final
Type:
SOLAR WAIVER - RES
Address NEW:
4656 S BRECKINRIDGE DR
Apply Date:
05/09/2022
Applicant:
Sunrun Installation Services, Inc
Description:
R - SYSTEM SIZE: 14620W DC, 11520W AC - MODULES: (43) JA SOLAR: JAM60S10-340/MR - INVERTERS: (1) DELTA ELECTRONICS: E8-TL-US, (1) DELTA ELECTRONICS: E4-TL-US - RACKING: ; ULTRA RAIL SPEEDSEAL FOOT, SEE DRAWING SNR-DC-00438 - MAIN BREAKER DERATE: REPLACE EXISTING 200 AMP MAIN BREAKER WITH NEW 175 AMP 22K AIC RATED MAIN BREAKER. - RAPID SHUTDOWN: (43) APSMART RSD-S-PLC ROOFTOP MODULE LEVEL RAPID SHUTDOWN DEVICE
Architects:
  • Same as abpve
Contractors:
  • Sunrun Installation Services, Inc

Permit Reviews

Permit Number - T22CM03492
Permit Status: Final
Permit Description: R - SYSTEM SIZE: 14620W DC, 11520W AC - MODULES: (43) JA SOLAR: JAM60S10-340/MR - INVERTERS: (1) DELTA ELECTRONICS: E8-TL-US, (1) DELTA ELECTRONICS: E4-TL-US - RACKING: ; ULTRA RAIL SPEEDSEAL FOOT, SEE DRAWING SNR-DC-00438 - MAIN BREAKER DERATE: REPLACE EXISTING 200 AMP MAIN BREAKER WITH NEW 175 AMP 22K AIC RATED MAIN BREAKER. - RAPID SHUTDOWN: (43) APSMART RSD-S-PLC ROOFTOP MODULE LEVEL RAPID SHUTDOWN DEVICE
Start Date Submittal Complete Date Status  
05/09/2022 OTHER 07/05/2022 COMPLETED Review Details
07/27/2022 RESUBMITTAL 07/28/2022 COMPLETED Review Details

Completed Inspections

Permit Status: Final
Permit Number: T22CM03492
Permit Description: R - SYSTEM SIZE: 14620W DC, 11520W AC - MODULES: (43) JA SOLAR: JAM60S10-340/MR - INVERTERS: (1) DELTA ELECTRONICS: E8-TL-US, (1) DELTA ELECTRONICS: E4-TL-US - RACKING: ; ULTRA RAIL SPEEDSEAL FOOT, SEE DRAWING SNR-DC-00438 - MAIN BREAKER DERATE: REPLACE EXISTING 200 AMP MAIN BREAKER WITH NEW 175 AMP 22K AIC RATED MAIN BREAKER. - RAPID SHUTDOWN: (43) APSMART RSD-S-PLC ROOFTOP MODULE LEVEL RAPID SHUTDOWN DEVICE
Total Completed Inspections - 3
Date Description Inspector Results Comments
09/16/2022 TEP CLEARANCE - PM TGAUSP Approved CODE DGC
09/16/2022 ELECTRIC - FINAL TGAUSP Approved Approved, please send DGC Clearance to TEP for the solar meter
09/16/2022 BUILDING - FINAL TGAUSP Approved Approved

Documents

File Name Document Type  
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
CUT SHEETS 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
GC LETTER 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
JOB CARD 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
LOAD CALCS 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PLAN SET 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
STRUCTURAL LETTER-CALCS 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
CUT SHEETS.PDF DOCUMENTS VIEW
GC LETTER.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
LOAD CALCS.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
PLAN SET.PDF DOCUMENTS VIEW
STRUCTURAL LETTER-CALCS.PDF DOCUMENTS VIEW