Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Commercial Building
Address NEW:
4325 S MARSTELLAR RD
Apply Date:
05/06/2022
Applicant:
Description:
85 KWAC SINGLE AXIS SOLAR TRACKER GROUND MOUNT PROJECT

Permit Reviews

Permit Number - T22CM03490
Permit Status: Complete
Permit Description: 85 KWAC SINGLE AXIS SOLAR TRACKER GROUND MOUNT PROJECT
Start Date Submittal Complete Date Status  
11/21/2022 COMMERCIAL PDSD SIMPLE REVIEW v.1 12/15/2022 APPROVED Review Details

Conditions

Permit Number - T22CM03490
Permit Status: Complete
Permit Description: 85 KWAC SINGLE AXIS SOLAR TRACKER GROUND MOUNT PROJECT
Date Description Comments
05/06/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
05/19/2022 SPECIAL INSPECTION FORMS AND REPORTS REQUIRED PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY.
05/19/2022 SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED.
05/19/2022 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.
05/19/2022 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
05/19/2022 SPECIAL INSPECTION FOR PILING, DRILLED PIERS AND CAISSONS IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: T22CM03490
Permite Description: 85 KWAC SINGLE AXIS SOLAR TRACKER GROUND MOUNT PROJECT
Total Outstanding Inspections - 7
Last Inspection Date Description Inspector Results Comments
10/27/2022 COT - LCBU - Building Final N/A Not Ready
10/26/2022 COT - LCEL - Electrical Intermediate N/A Not Ready
10/27/2022 COT - LCBU - Framing N/A Not Ready
10/27/2022 COT - LCEL - Electrical Final N/A Not Ready
10/26/2022 COT - LCBU - Building Progress N/A Not Ready
10/26/2022 COT - LCEL - Grounding/Bonding N/A Not Ready
10/26/2022 COT - LCEL - Electrical Underground N/A Not Ready

Completed Inspections

Permit Status: Complete
Permit Number: T22CM03490
Permit Description: 85 KWAC SINGLE AXIS SOLAR TRACKER GROUND MOUNT PROJECT
Total Completed Inspections - 3
Date Description Inspector Results Comments
10/12/2022 PDSD Building Division - TEP PM Clearance Passed {Activity date: 10/12/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - CODE DGL/POWERKILL}
10/12/2022 COT - LCEL - Service Upgrade Passed {Activity date: 10/12/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved, DGL- Line-side Tap Clearance was called into Kathleen w/ Trico at 11:00am (power-kill)}
10/13/2022 COT - LCBU - Excavation/Rebar/Zoning Passed {Activity date: 10/13/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - APPROVED all steel piles for the solar panels and equipment racks}

Documents

File Name Document Type  
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
GEO REPORT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
GROUND FORCE ANALYSIS 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PLAN SET 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
SAECO MEMO 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
SIC 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
STRUCTURAL ANALYSIS 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
STRUCTURAL CALCS 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
GEO REPORT.PDF DOCUMENTS VIEW
GROUND FORCE ANALYSIS.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
PLAN SET.PDF DOCUMENTS VIEW
SAECO MEMO.PDF DOCUMENTS VIEW
SIC.PDF DOCUMENTS VIEW
STRUCTURAL ANALYSIS.PDF DOCUMENTS VIEW
STRUCTURAL CALCS.PDF DOCUMENTS VIEW
T22CM03490 - SAVSARP WELL SA-003A - SI CERTIFICATE-2022-11-07_V1.PDF DOCUMENTS VIEW
T22CM03490 - SAVSARP WELL SA-003A - SI FINAL REPORT_V1.PDF DOCUMENTS VIEW
LOFC_LETTEROFCOMPLETION.PDF DOCUMENTS VIEW