Permit: T22CM03483
Permit Details
Apply Date:
05/06/2022
Applicant:
Andrea Flood
Description:
SFR STF40K T20-M0039
Permit Reviews
Permit Number - T22CM03483
Permit Status: Expired
Permit Description: SFR STF40K T20-M0039
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
10/16/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/17/2023 | APPROVED |
09/19/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/21/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - T22CM03483
Permit Status: Expired
Permit Description: SFR STF40K T20-M0039
Total Outstanding Activity Conditions - 2
Date | Name |
---|---|
10/18/2023 | The Contractor you have added to your permit cannot be verified. Please contact staff to have the ROC number added to the account. |
10/18/2023 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as a contact. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Conditions
Permit Number - T22CM03483
Permit Status: Expired
Permit Description: SFR STF40K T20-M0039
Date | Description | Comments |
---|---|---|
05/06/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. | |
05/06/2022 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) | |
05/06/2022 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
05/06/2022 | NO FINAL UNTIL THE PUBLIC SEWER G-2020-053/P20WP00249 IS ACCEPTED ANDRELEASED BY PCRWRD | |
10/17/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
10/17/2023 | Post-Tension Inspection Report is required. | |
10/13/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Outstanding Inspections
Permit Status: Expired
Permit Number: T22CM03483
Permite Description: SFR STF40K T20-M0039
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/12/2023 | COT - RSPL - Plumbing Final | N/A | Not Ready |
Completed Inspections
Permit Status: Expired
Permit Number: T22CM03483
Permit Description: SFR STF40K T20-M0039
Total Completed Inspections - 23
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/15/2022 | COT - RSPL - Yard Water Line | Passed | {Activity date: 06/15/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
06/15/2022 | COT - RSPL - Rough Soil | Passed | {Activity date: 06/15/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
06/16/2022 | COT - RSPL - Sewer | Passed | {Activity date: 06/16/2022; Status: Approved; Inspector: TLUINDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 06/15/2022; Status: Denied; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - . DE. Install trace wire.} | |
06/27/2022 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 06/27/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved} | |
06/27/2022 | COT - RSBU - Preslab | Passed | {Activity date: 06/27/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved} | |
06/27/2022 | COT - RSEL - Electrical Underground | Passed | {Activity date: 06/27/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved} | |
06/27/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 06/27/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved} | |
08/18/2022 | COT - RSBU - Roof Nailing | Passed | {Activity date: 08/18/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
08/18/2022 | COT - RSBU - Exterior Clips/Sheathing | Passed | {Activity date: 08/18/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
12/22/2022 | BULD - Electrical Clearance | Passed | TEP ECO | |
12/22/2022 | COT - RSPL - Gas Pressure Test | Passed | ||
12/22/2022 | COT - LCPL - Plumbing Intermediate | Passed | ||
12/22/2022 | RSME - Mechanical Progress | Passed | ||
12/22/2022 | COT - RSEL - Construction Power | Passed | ||
12/22/2022 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
12/22/2022 | COT - LCBU - Framing | Passed | ||
01/25/2023 | COT - HCBU - Interior Shear Bracing | Passed | ||
04/12/2023 | COT - BULD - SWG Clearance | Passed | Clearance for Southwest Gas. 4/12/2023 | |
05/02/2023 | COT - RSPL - Plumbing Final | Passed | ||
05/02/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
05/02/2023 | COT - RSME - Mechanical Final | Passed | ||
05/03/2023 | RSBU - Building Final | Passed | ||
05/03/2023 | COT - RSEL - Electrical Final | Passed |