Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
05/06/2022
Applicant:
Gabe Lara
Description:
New Commercial Shell Bldg

Permit Reviews

Permit Number - T22CM03469
Permit Status: Complete
Permit Description: New Commercial Shell Bldg
Start Date Submittal Complete Date Status  
05/06/2022 3RD PARTY REVIEW - COMMERCIAL 07/21/2022 COMPLETED Review Details
09/01/2022 REVISION - - 1ST 09/23/2022 COMPLETED Review Details
08/14/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 08/16/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - T22CM03469
Permit Status: Complete
Permit Description: New Commercial Shell Bldg
Total Outstanding Activity Conditions - 1
Date Name
06/28/2022 SHOP DRAWINGS REQUIRED FOR WOOD I JOISTS.

Conditions

Permit Number - T22CM03469
Permit Status: Complete
Permit Description: New Commercial Shell Bldg
Date Description Comments
06/28/2022 SPECIAL INSPECTION FOR CONCRETE IS REQUIRED..
06/28/2022 SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED.
06/28/2022 SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED.
06/28/2022 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.
06/28/2022 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
06/28/2022 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
06/28/2022 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
07/21/2022 This building permit approval is without public sewer connection review or approval. It is strictly the responsibility of the owner and/or person doing the work to ensure that the appropriate review and approval to connect is obtained from Regional Wastewater Reclamation Department (RWRD) wastewater provider or Pima County DEQ approval of/and alternative disposal system. It is required that owner and/or person doing the work solicit all requisite approvals from the wastewater provider prior to obtaining this building construction permit. RWRD connection information is available at www.pima.gov/wwm/developer.htm
07/21/2022 PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE OF FINAL STATUS.

Outstanding Inspections

Permit Status: Complete
Permit Number: T22CM03469
Permite Description: New Commercial Shell Bldg
Total Outstanding Inspections - 9
Last Inspection Date Description Inspector Results Comments
10/27/2022 COT - LCBU - Framing N/A Not Ready
10/26/2022 COT - LCPL - Plumbing Final N/A Not Ready
10/26/2022 FCON – OH Piping & Hydro N/A Not Ready
10/26/2022 COT - FCON - Alarm - Final N/A Not Ready
10/26/2022 COT - FCON - Sprinkler - Final N/A Not Ready
10/26/2022 COT - FCON - Fire - Final N/A Not Ready
10/26/2022 COT - LCPL - Rough Soil N/A Not Ready
04/17/2023 COT - LCBU - Sustainability N/A Not Ready
06/06/2023 COT - LCEL - Construction Power N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: T22CM03469
Permit Description: New Commercial Shell Bldg
Total Completed Inspections - 24
Date Description Inspector Results Comments
09/19/2022 COT - LCEL - Electrical Underground Passed {Activity date: 09/19/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved. Electric ufer.
} ; {Activity date: 09/12/2022; Status: Partial Approval; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - PA. Approved as noted on approved plans}
09/19/2022 COT - LCBU - Excavation/Rebar/Zoning Passed {Activity date: 09/19/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved. Footings; OK to place concrete in progress areas}
09/19/2022 COT - LCBU - Preslab Passed {Activity date: 09/19/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved}
11/15/2022 COT - LCPL - Plumbing Roof Drains Passed
11/15/2022 COT - LCPL - Plumbing Intermediate Passed
11/15/2022 COT - HCBU - Exterior Clips/Sheathing Passed
11/15/2022 COT - LCPL - Medical Gas Preconstruction Mtg Passed
11/15/2022 COT - LCBU - Exterior Clips/Sheathing Passed
11/15/2022 COT - LCBU - Roof Nailing Passed
11/15/2022 COT - HCBU - Interior Shear Bracing Passed
12/06/2022 COT - FCON - Underground Flush Passed Subcontractors permit approved on 6/27/22 by J. Fordney.
12/08/2022 COT - FCON - Underground Pressure Passed Approved on subcontractors permit on 6/20/22 by J. Vincent.
04/06/2023 COT - LCPL - Backwater Valve Passed
04/06/2023 COT - LCPL - Sewer Passed
05/25/2023 COT - LCPL - Plumbing Final Passed
05/25/2023 COT - LCEL - Electrical Final Passed
05/25/2023 COT - LCEL - Electrical Intermediate Passed
05/25/2023 COT - LCEL - Outdoor Lighting Passed
06/02/2023 COT - FCON - Alarm - Final Passed
06/02/2023 COT - FCON - Sprinkler - Final Passed
06/02/2023 COT - FCON - Fire - Final Passed
06/06/2023 COT - LCPL - Rough Soil Passed
06/06/2023 COT - LCEL - Grounding/Bonding Passed
06/06/2023 COT - LCBU - Building Final Passed

Documents

File Name Document Type  
LOFC_LETTEROFCOMPLETION.PDF DOCUMENTS VIEW
FINAL SIC-2023-08-14_V1.PDF DOCUMENTS VIEW
CUTSHEETS_LIGHTING.PDF DOCUMENTS VIEW
STRUCTURAL CALCS.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
GEOTECH.PDF DOCUMENTS VIEW
ENERGY COMP CERT.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PLAN SET.PDF CONSTRPLANS VIEW
PSA_STANTEC.PDF DOCUMENTS VIEW
SPECIAL INSPECTION CERT.PDF DOCUMENTS VIEW