Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T22CM03467
Permit Details
Status:
Issued
Type:
Residential Building - One or Two Family
Address:
7267 E CAMINITO CONTENTO
Address NEW:
7267 E CAMINITO CONTENTO
Apply Date:
05/06/2022
Applicant:
Description:
R - Solar module installation of a 3.645 kW DC. 9 HANWHA QCELLS Q.PEAK DUO BLK ML-G10+9 ENPHASE IQ
Permit Reviews
Permit Number - T22CM03467
Permit Status: Issued
Permit Description: R - Solar module installation of a 3.645 kW DC. 9 HANWHA QCELLS Q.PEAK DUO BLK ML-G10+9 ENPHASE IQ
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/06/2022 | OTHER | 07/06/2022 | COMPLETED |
| 08/16/2022 | REVISION - - 1ST | 09/21/2022 | COMPLETED |
Conditions
Permit Number - T22CM03467
Permit Status: Issued
Permit Description: R - Solar module installation of a 3.645 kW DC. 9 HANWHA QCELLS Q.PEAK DUO BLK ML-G10+9 ENPHASE IQ
| Date | Description | Comments |
|---|---|---|
| 05/06/2022 | THE INSTALLATION SHALL COMPLY WITH ALL APPLICABLE REQUIREMENTS OF SECTION 605.11.1 THROUGH 605.11.4 OF THE 2012 EDITION OF THE INTERNATIONAL FIRE CODE, THE INTERNATIONAL BUILDING CODE AND NFPA 70. |
Outstanding Inspections
Permit Status: Issued
Permit Number: T22CM03467
Permite Description: R - Solar module installation of a 3.645 kW DC. 9 HANWHA QCELLS Q.PEAK DUO BLK ML-G10+9 ENPHASE IQ
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/13/2023 | COT - RSEL - Service Upgrade | N/A | Not Applicable | upgrade did not happen |
Completed Inspections
Permit Status: Issued
Permit Number: T22CM03467
Permit Description: R - Solar module installation of a 3.645 kW DC. 9 HANWHA QCELLS Q.PEAK DUO BLK ML-G10+9 ENPHASE IQ
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/13/2023 | COT - RSEL - Electrical Final | Passed | ||
| 01/13/2023 | RSBU - Building Final | Passed | solar | |
| 01/13/2023 | BULD - Electrical Clearance | Passed | Approved, DGC Clearance to TEP is required for the solar meter |