Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address:
2241 E GLENN ST
Address NEW:
2241 E GLENN ST
Apply Date:
05/06/2022
Applicant:
Description:
R - roof mount 8.40 kW DC photovoltaic solar system; 21 AC modules, 2 branches, PV subpanel, 40A PV

Permit Reviews

Permit Number - T22CM03449
Permit Status: Complete
Permit Description: R - roof mount 8.40 kW DC photovoltaic solar system; 21 AC modules, 2 branches, PV subpanel, 40A PV
Start Date Submittal Complete Date Status  
05/06/2022 OTHER 08/03/2022 COMPLETED Review Details
08/07/2022 RESUBMITTAL 08/09/2022 COMPLETED Review Details

Conditions

Permit Number - T22CM03449
Permit Status: Complete
Permit Description: R - roof mount 8.40 kW DC photovoltaic solar system; 21 AC modules, 2 branches, PV subpanel, 40A PV
Date Description Comments
05/06/2022 THE INSTALLATION SHALL COMPLY WITH ALL APPLICABLE REQUIREMENTS OF SECTION 605.11.1 THROUGH 605.11.4 OF THE 2012 EDITION OF THE INTERNATIONAL FIRE CODE, THE INTERNATIONAL BUILDING CODE AND NFPA 70.
07/13/2022 FUP T22OT00496 MUST BE PAID BEFORE FINAL INSPECTIONS.
07/13/2022 FUP T22OT00496 MUST BE PAID BEFORE FINAL INSPECTIONS.
08/03/2022 INSTALL ALL EQUIPMENT 1 FOOT ABOVE BASE FLOOD ELEVATION

Completed Inspections

Permit Status: Complete
Permit Number: T22CM03449
Permit Description: R - roof mount 8.40 kW DC photovoltaic solar system; 21 AC modules, 2 branches, PV subpanel, 40A PV
Total Completed Inspections - 3
Date Description Inspector Results Comments
08/18/2022 PDSD Building Division - TEP PM Clearance Passed {Activity date: 08/18/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - CODE DGC}
08/18/2022 RSBU - Building Final Passed {Activity date: 08/18/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved}
08/18/2022 COT - RSEL - Electrical Final Passed {Activity date: 08/18/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved, please send DGC Clearance to TEP for the solar meter}

Documents

File Name Document Type  
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
CUT SHEETS 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
JOB CARD 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PLAN SET 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
CUT SHEETS.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
PLAN SET.PDF DOCUMENTS VIEW
LOFC_LETTEROFCOMPLETION.PDF DOCUMENTS VIEW
LOFC_LETTEROFCOMPLETION.PDF DOCUMENTS VIEW