Permit: T22CM03400
Permit Details
Apply Date:
05/04/2022
Applicant:
burak bekat
Description:
SFR BRIOS1432 T20-M0059
Permit Reviews
Permit Number - T22CM03400
Permit Status: Complete
Permit Description: SFR BRIOS1432 T20-M0059
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
05/04/2022 | OTHER | 06/08/2022 | COMPLETED |
02/27/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 02/27/2024 | REQUIRES RESUBMIT |
02/06/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 02/06/2024 | APPROVED |
03/04/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 03/11/2024 | APPROVED |
Conditions
Permit Number - T22CM03400
Permit Status: Complete
Permit Description: SFR BRIOS1432 T20-M0059
Date | Description | Comments |
---|---|---|
05/04/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. | |
05/04/2022 | SPECIAL INSPECTION FORMS AND REPORTS REQUIRED PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY. | |
05/04/2022 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. | |
02/27/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
02/27/2024 | Water Meter Size | |
02/27/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
02/27/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
02/27/2024 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. | |
02/27/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: T22CM03400
Permite Description: SFR BRIOS1432 T20-M0059
Total Outstanding Inspections - 5
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/22/2023 | COT - RSEL - Construction Power | N/A | Not Applicable | |
11/22/2023 | COT - RSBU - Sustainability | N/A | Not Applicable | |
10/27/2022 | COT - RSPL - Plumbing Final | N/A | Not Ready | |
12/11/2023 | RSBU - Building Final | N/A | Re-inspection required | 12/11/23: UV coat all exterior piping on roof and throughout. |
11/28/2023 | COT - RSME - Mechanical Final | N/A | Not Ready |
Completed Inspections
Permit Status: Complete
Permit Number: T22CM03400
Permit Description: SFR BRIOS1432 T20-M0059
Total Completed Inspections - 20
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/15/2022 | COT - RSPL - Rough Soil | Passed | {Activity date: 09/15/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved} | |
09/26/2022 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 09/26/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved} | |
09/26/2022 | COT - RSBU - Preslab | Passed | {Activity date: 09/26/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved} | |
09/26/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 09/26/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved} | |
10/12/2022 | COT - RSBU - Roof Nailing | Passed | {Activity date: 10/12/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved} | |
04/11/2023 | COT - LCBU - Framing | Passed | ||
04/11/2023 | COT - LCPL - Plumbing Intermediate | Passed | ||
04/11/2023 | RSEL - Electrical Progress | Passed | ||
04/11/2023 | RSME - Mechanical Progress | Passed | ||
10/03/2023 | BULD - Electrical Clearance | Passed | 10/3/23 Clearance ECO | |
11/22/2023 | COT - RSEL - Electrical Final | Passed | ||
11/22/2023 | COT - HCBU - Interior Shear Bracing | Passed | ||
11/22/2023 | COT - RSPL - Yard Water Line | Passed | ||
11/22/2023 | COT - RSEL - Electrical Underground | Passed | ||
11/22/2023 | COT - RSPL - Plumbing Final | Passed | ||
11/22/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
11/22/2023 | COT - RSPL - Sewer | Passed | ||
02/12/2024 | ENGR Engineering Final | Passed | ||
02/20/2024 | RSBU - Building Final | Passed | OK for CofO | |
03/26/2024 | COT - RSME - Mechanical Final | Passed |