Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T22CM03392
Permit Details
Apply Date:
05/04/2022
Applicant:
Sunrun Installation Services, Inc
Description:
R - SYSTEM SIZE: 6120W DC, 4320W AC - MODULES: (18) JA SOLAR: JAM60S10-340/MR - INVERTERS: (18) ENPHASE ENERGY: IQ7-60-2-US - RACKING: ; SOLLEGA FASTRACK510 WITH 304 STAINLESS STEEL HARDWARE - MAIN PANEL REPLACEMENT: EXISTING 100 AMP MAIN PANEL TO BE REPLACED WITH NEW 225 AMP MAIN PANEL WITH 200 AMP MAIN BREAKER.
Architects:
- Same as above
Contractors:
- Sunrun Installation Services, Inc
Permit Reviews
Permit Number - T22CM03392
Permit Status: Final
Permit Description: R - SYSTEM SIZE: 6120W DC, 4320W AC
- MODULES: (18) JA SOLAR: JAM60S10-340/MR
- INVERTERS: (18) ENPHASE ENERGY: IQ7-60-2-US
- RACKING: ; SOLLEGA FASTRACK510 WITH 304 STAINLESS
STEEL HARDWARE
- MAIN PANEL REPLACEMENT: EXISTING 100 AMP MAIN
PANEL TO BE REPLACED WITH NEW 225 AMP MAIN PANEL
WITH 200 AMP MAIN BREAKER.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
05/04/2022 | OTHER | 06/29/2022 | COMPLETED |
Completed Inspections
Permit Status: Final
Permit Number: T22CM03392
Permit Description: R - SYSTEM SIZE: 6120W DC, 4320W AC
- MODULES: (18) JA SOLAR: JAM60S10-340/MR
- INVERTERS: (18) ENPHASE ENERGY: IQ7-60-2-US
- RACKING: ; SOLLEGA FASTRACK510 WITH 304 STAINLESS
STEEL HARDWARE
- MAIN PANEL REPLACEMENT: EXISTING 100 AMP MAIN
PANEL TO BE REPLACED WITH NEW 225 AMP MAIN PANEL
WITH 200 AMP MAIN BREAKER.
Total Completed Inspections - 4
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/24/2022 | ELECTRIC - SERVICE UPGRADE | TGAUSP | Approved | Approved, INCR Clearance was called into TEP at 10:15 am (power-kill) |
08/29/2022 | BUILDING - FINAL | TGAUSP | Approved | Approved |
08/29/2022 | ELECTRIC - FINAL | TGAUSP | Approved | - Approved, please send DGC Clearance to TEP for the solar meter |
08/29/2022 | TEP CLEARANCE - PM | TLUNDBERG | Approved | CODE DGC |