Permit: T22CM03385
Permit Details
Status:
Issued
Type:
Residential Building - One or Two Family
Address:
1329 W LAPORTE LN
Address NEW:
1329 W LAPORTE LN
Apply Date:
05/04/2022
Applicant:
Erus Energy
Description:
R - Solar module installation of a 11.475 kW DC. 29 HANWHA QCELLS Q.PEAK DUO BLK ML-G10+. 29 ENPHASE
Permit Reviews
Permit Number - T22CM03385
Permit Status: Issued
Permit Description: R - Solar module installation of a 11.475 kW DC. 29 HANWHA QCELLS Q.PEAK DUO BLK ML-G10+. 29 ENPHASE
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/04/2022 | OTHER | 06/29/2022 | COMPLETED |
Conditions
Permit Number - T22CM03385
Permit Status: Issued
Permit Description: R - Solar module installation of a 11.475 kW DC. 29 HANWHA QCELLS Q.PEAK DUO BLK ML-G10+. 29 ENPHASE
| Date | Description | Comments |
|---|---|---|
| 05/04/2022 | THE INSTALLATION SHALL COMPLY WITH ALL APPLICABLE REQUIREMENTS OF SECTION 605.11.1 THROUGH 605.11.4 OF THE 2012 EDITION OF THE INTERNATIONAL FIRE CODE, THE INTERNATIONAL BUILDING CODE AND NFPA 70. |
Outstanding Inspections
Permit Status: Issued
Permit Number: T22CM03385
Permite Description: R - Solar module installation of a 11.475 kW DC. 29 HANWHA QCELLS Q.PEAK DUO BLK ML-G10+. 29 ENPHASE
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2022 | COT - RSEL - Electrical Final | N/A | Not Ready |
Completed Inspections
Permit Status: Issued
Permit Number: T22CM03385
Permit Description: R - Solar module installation of a 11.475 kW DC. 29 HANWHA QCELLS Q.PEAK DUO BLK ML-G10+. 29 ENPHASE
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/19/2022 | PDSD Building Division - TEP PM Clearance | Passed | {Activity date: 09/19/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - CODE INCR/POWERKILL} | |
| 09/19/2022 | COT - RSEL - Service Upgrade | Passed | {Activity date: 09/19/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved, INCR Clearance was called into TEP at 9:15am Natalie (power-kill)} | |
| 12/13/2022 | BULD - Electrical Clearance | Passed | Approved, DGC to TEP is required | |
| 12/13/2022 | COT - RSEL - Electrical Final | Passed | Approved, DGC to TEP is required | |
| 12/13/2022 | RSBU - Building Final | Passed | Solar |