Permit: T22CM03372
Permit Details
Apply Date:
05/04/2022
Applicant:
Ben Smith
Description:
SFR F60A22 T22-M0028
Permit Reviews
Permit Number - T22CM03372
Permit Status: Issued
Permit Description: SFR F60A22 T22-M0028
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
03/30/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/20/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - T22CM03372
Permit Status: Issued
Permit Description: SFR F60A22 T22-M0028
Total Outstanding Activity Conditions - 3
Date | Name |
---|---|
05/04/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
05/04/2022 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) |
05/04/2022 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
Outstanding Inspections
Permit Status: Issued
Permit Number: T22CM03372
Permite Description: SFR F60A22 T22-M0028
Total Outstanding Inspections - 3
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/05/2022 | COT - LCBU - Framing | N/A | Re-inspection required | see intermediate notes |
12/05/2022 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Re-inspection required | fire block top of chase at garage opening and great room, window missing at bathroom, king stud missing at patio window, AB’s missing at exterior shear walls, shim all truss bearing points, remove all untreated wood within 1” f concrete |
03/28/2023 | COT - RSPL - Plumbing Final | N/A | Re-inspection required | 3/28/2023: cut all clean outs to grade gas meter needed |
Completed Inspections
Permit Status: Issued
Permit Number: T22CM03372
Permit Description: SFR F60A22 T22-M0028
Total Completed Inspections - 23
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/21/2022 | COT - RSPL - Yard Water Line | Passed | {Activity date: 06/21/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
06/21/2022 | COT - RSPL - Sewer | Passed | {Activity date: 06/21/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
06/21/2022 | COT - RSPL - Rough Soil | Passed | {Activity date: 06/21/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
06/30/2022 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 06/30/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved} | |
06/30/2022 | COT - RSBU - Preslab | Passed | {Activity date: 06/30/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved} | |
06/30/2022 | COT - RSEL - Electrical Underground | Passed | {Activity date: 06/30/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved} | |
06/30/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 06/30/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved} | |
07/26/2022 | COT - RSBU - Roof Nailing | Passed | {Activity date: 07/26/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
12/05/2022 | BULD - Electrical Clearance | Passed | TEP ECO | |
12/05/2022 | COT - RSEL - Construction Power | Passed | ||
12/05/2022 | COT - RSPL - Gas Pressure Test | Passed | ||
12/05/2022 | COT - LCPL - Plumbing Intermediate | Passed | ||
12/14/2022 | COT - LCBU - Framing | Passed | ||
12/14/2022 | RSME - Mechanical Progress | Passed | ||
12/14/2022 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
01/17/2023 | COT - HCBU - Interior Shear Bracing | Passed | ||
01/31/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
03/24/2023 | COT - BULD - SWG Clearance | Passed | Gas line is complete. Ball valves are installed at each appliance location. | |
03/28/2023 | COT - RSEL - Electrical Final | Passed | ||
03/28/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
03/30/2023 | RSBU - Building Final | Passed | ||
03/30/2023 | COT - RSME - Mechanical Final | Passed | ||
03/30/2023 | COT - RSPL - Plumbing Final | Passed |