Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T22CM03370
Permit Details
Status:
Issued
Type:
Residential Building - One or Two Family
Address:
12794 E TORTOISE POINTE DR
Address NEW:
12794 E TORTOISE POINTE DR
Apply Date:
05/03/2022
Applicant:
Amy Stokes, Operations Accountant
Description:
SFR RKM45R T21-M0093
Permit Reviews
Permit Number - T22CM03370
Permit Status: Issued
Permit Description: SFR RKM45R T21-M0093
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/18/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 03/21/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - T22CM03370
Permit Status: Issued
Permit Description: SFR RKM45R T21-M0093
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 05/03/2022 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
Conditions
Permit Number - T22CM03370
Permit Status: Issued
Permit Description: SFR RKM45R T21-M0093
| Date | Description | Comments |
|---|---|---|
| 05/03/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. | |
| 05/03/2022 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) | |
| 07/27/2022 | NO FINAL UNTIL THE DISCHARGE AUTHORIZATION FOR #P21SD00033 IS ISSUED BY PDEQ |
Outstanding Inspections
Permit Status: Issued
Permit Number: T22CM03370
Permite Description: SFR RKM45R T21-M0093
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/03/2022 | RSME - Mechanical Progress | N/A | Re-inspection required | |
| 10/26/2022 | COT - RSPL - Sewer | N/A | Not Ready | |
| 10/27/2022 | COT - RSPL - Plumbing Final | N/A | Not Ready |
Completed Inspections
Permit Status: Issued
Permit Number: T22CM03370
Permit Description: SFR RKM45R T21-M0093
Total Completed Inspections - 20
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/31/2022 | COT - RSPL - Rough Soil | Passed | {Activity date: 08/31/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Approved} ; {Activity date: 08/15/2022; Status: Denied; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - DE Rocky soil conditions. Remove pipe and over-excavate 2 pipe diameters and bring to proper grade with suitable compacted granular material. 2018 IRC P2604.1} |
|
| 09/08/2022 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 09/08/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
| 09/08/2022 | COT - RSBU - Preslab | Passed | {Activity date: 09/08/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
| 09/08/2022 | COT - RSEL - Electrical Underground | Passed | {Activity date: 09/08/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
| 09/08/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 09/08/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
| 09/28/2022 | COT - RSBU - Roof Nailing | Passed | {Activity date: 09/28/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} ; {Activity date: 09/27/2022; Status: Not ready for Inspection; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - NR} ; {Activity date: 09/26/2022; Status: Cancelled; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - CA} | |
| 10/10/2022 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | {Activity date: 10/10/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} ; {Activity date: 09/28/2022; Status: Denied; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - DE Missing anchor bolts at end of shear walls, opening in center bearing wall requires two 2x6 each end} ; {Activity date: 09/27/2022; Status: Not ready for Inspection; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - NR Not ready for inspection. The contractor did not walk his site to confirm it was ready for inspection.} ; {Activity date: 09/26/2022; Status: Not ready for Inspection; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - NR Girder not posted, framing at master bedroom door not per plan, inspection stopped.} |
|
| 10/19/2022 | COT - RSPL - Yard Water Line | Passed | {Activity date: 10/19/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} ; {Activity date: 08/31/2022; Status: Not ready for Inspection; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Not ready} | |
| 11/07/2022 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 11/07/2022 | COT - LCPL - Plumbing Intermediate | Passed | ||
| 11/15/2022 | COT - HCBU - Interior Shear Bracing | Passed | ||
| 12/06/2022 | COT - RSPL - Sewer | Passed | ||
| 12/22/2022 | BULD - Electrical Clearance | Passed | TEP ECO | |
| 12/22/2022 | COT - RSEL - Construction Power | Passed | ||
| 01/10/2023 | COT - BULD - SWG Clearance | Passed | SWG meter only | |
| 02/17/2023 | COT - RSPL - Plumbing Final | Passed | ||
| 02/17/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
| 02/17/2023 | RSBU - Building Final | Passed | ||
| 02/17/2023 | COT - RSEL - Electrical Final | Passed | ||
| 02/17/2023 | COT - RSME - Mechanical Final | Passed |