Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Apply Date:
05/02/2022
Applicant:
Ben Smith
Description:
SFR F50E22 T22-M0029

Permit Reviews

Permit Number - T22CM03268
Permit Status: Complete
Permit Description: SFR F50E22 T22-M0029
Start Date Submittal Complete Date Status  
05/02/2022 OTHER 06/09/2022 COMPLETED Review Details
01/02/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 01/03/2024 APPROVED Review Details

Conditions

Permit Number - T22CM03268
Permit Status: Complete
Permit Description: SFR F50E22 T22-M0029
Date Description Comments
05/02/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
05/02/2022 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
01/02/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
01/02/2024 Post-Tension Inspection Report is required.
01/02/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
01/02/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.

Outstanding Inspections

Permit Status: Complete
Permit Number: T22CM03268
Permite Description: SFR F50E22 T22-M0029
Total Outstanding Inspections - 6
Last Inspection Date Description Inspector Results Comments
COT - FCON - Sprinkler - Final N/A Not Ready
06/23/2023 COT - RSME - Mechanical Final N/A Canceled
06/23/2023 COT - RSEL - Outdoor Lighting N/A Canceled
06/23/2023 COT - RSEL - Electrical Final N/A Canceled
06/23/2023 RSBU - Building Final N/A Canceled
06/23/2023 RSBU - Building Progress N/A Canceled 6/23/23: canceled per superintendent

Completed Inspections

Permit Status: Complete
Permit Number: T22CM03268
Permit Description: SFR F50E22 T22-M0029
Total Completed Inspections - 26
Date Description Inspector Results Comments
06/27/2022 COT - RSPL - Yard Water Line Passed {Activity date: 06/27/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved} ; {Activity date: 06/15/2022; Status: Denied; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - DE. Not under pressure}
06/27/2022 COT - RSPL - Sewer Passed {Activity date: 06/27/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved} ; {Activity date: 06/15/2022; Status: Denied; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - DE. Uncover sewer pipe and expose trace wire}
06/27/2022 COT - RSPL - Rough Soil Passed {Activity date: 06/27/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved} ; {Activity date: 06/15/2022; Status: Denied; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - DE. Stack low on water}
07/07/2022 COT - RSEL - Grounding/Bonding Passed {Activity date: 07/07/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP}
07/07/2022 COT - RSBU - Preslab Passed {Activity date: 07/07/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP}
07/07/2022 COT - RSEL - Electrical Underground Passed {Activity date: 07/07/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP}
07/07/2022 COT - RSBU - Excavation/Rebar/Zoning Passed {Activity date: 07/07/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP}
08/11/2022 COT - RSBU - Roof Nailing Passed {Activity date: 08/11/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP}
08/16/2022 COT - RSBU - Exterior Clips/Sheathing Passed {Activity date: 08/16/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 08/11/2022; Status: Denied; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - DE
1. Shim king studs over patio opening.
2. Install blocking above patio opening as noted on plan
3. Anchor bolts are required at each end of shear walls.}
01/25/2023 COT - LCPL - Plumbing Intermediate Passed
01/25/2023 COT - LCBU - Framing Passed
01/25/2023 COT - RSPL - Gas Pressure Test Passed
01/25/2023 RSME - Mechanical Progress Passed
01/25/2023 COT - RSEL - Construction Power Passed TEP ECO
01/25/2023 FCON – OH Piping & Hydro Passed Approved on 1/17/23 on permit TF-FCP-1122-00174
01/25/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
03/09/2023 COT - HCBU - Interior Shear Bracing Passed 3/9/2023 corrections were made
05/12/2023 COT - BULD - SWG Clearance Passed SWG clearance issued
06/20/2023 COT - FCON - Fire - Final Passed
06/23/2023 COT - FCON - Sprinkler - Final Passed Approved on 6/20/23 on permit TF-FCP-1122-00174.
06/29/2023 COT - RSME - Mechanical Final Passed
06/29/2023 COT - RSEL - Outdoor Lighting Passed
06/29/2023 COT - RSEL - Electrical Final Passed
07/06/2023 RSBU - Building Final Passed 6/16/23: Not Ready
6/23/23: canceled per superintendent
6/29/23: missing water hammer arrester at dishwasher
7/6/23: passed
06/29/2023 RSBU - Building Progress Passed
07/06/2023 COT - RSPL - Plumbing Final Passed 6/29/23: missing water hammer arrester at dishwasher
7/6/23: passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
1_APPLICATION_V1.PDF DOCUMENTS VIEW
1_ST SEWER ACCEPTANCE LETTER_V1.PDF DOCUMENTS VIEW
152455 - SAGUARO TRAILS LOT 3335 - PT REPORT-2024-01-02_V1.PDF DOCUMENTS VIEW
G-2020-052 FINAL ACCEPTANCE_V1.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
SIC.PDF DOCUMENTS VIEW
SITE PLAN.PDF DOCUMENTS VIEW