Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T22CM03264
Permit Details
Apply Date:
05/02/2022
Applicant:
Ben Smith
Description:
SFR F50A22 T22-M0021
Outstanding Activity Conditions
Permit Number - T22CM03264
Permit Status: Issued
Permit Description: SFR F50A22 T22-M0021
Total Outstanding Activity Conditions - 3
Date | Name |
---|---|
05/02/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
05/02/2022 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) |
05/02/2022 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
Outstanding Inspections
Permit Status: Issued
Permit Number: T22CM03264
Permite Description: SFR F50A22 T22-M0021
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/06/2022 | COT - RSPL - Gas Pressure Test | N/A | Re-inspection required |
Completed Inspections
Permit Status: Issued
Permit Number: T22CM03264
Permit Description: SFR F50A22 T22-M0021
Total Completed Inspections - 23
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/20/2022 | COT - RSPL - Sewer | Passed | {Activity date: 05/20/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
05/23/2022 | COT - RSPL - Yard Water Line | Passed | {Activity date: 05/23/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved} ; {Activity date: 05/20/2022; Status: Not ready for Inspection; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - NR} | |
05/23/2022 | COT - RSPL - Rough Soil | Passed | {Activity date: 05/23/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved} ; {Activity date: 05/20/2022; Status: Correction Required; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - CO 1. Remove all rocks/clods from trench. 2. Support soil pipe with approved bedding material Note: water is full in all pipes} |
|
06/07/2022 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 06/07/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
06/07/2022 | COT - RSBU - Preslab | Passed | {Activity date: 06/07/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
06/07/2022 | COT - RSEL - Electrical Underground | Passed | {Activity date: 06/07/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
06/07/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 06/07/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
07/20/2022 | COT - RSBU - Roof Nailing | Passed | {Activity date: 07/20/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
08/04/2022 | COT - RSBU - Exterior Clips/Sheathing | Passed | {Activity date: 08/04/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 07/20/2022; Status: Denied; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - DE Large patio opening not framed per plan. Detail 301 for interior shear walls not in the approved plans. This is a incomplete inspection.} |
|
12/07/2022 | COT - RSEL - Construction Power | Passed | TEP ECO | |
12/07/2022 | COT - RSPL - Gas Pressure Test | Passed | ||
12/07/2022 | BULD - Electrical Clearance | Passed | TEP ECO | |
12/15/2022 | COT - LCBU - Framing | Passed | ||
12/15/2022 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
12/15/2022 | COT - LCPL - Plumbing Intermediate | Passed | ||
12/15/2022 | RSME - Mechanical Progress | Passed | ||
01/03/2023 | COT - HCBU - Interior Shear Bracing | Passed | ||
03/16/2023 | COT - BULD - SWG Clearance | Passed | SWG for meter only | |
04/10/2023 | COT - RSPL - Plumbing Final | Passed | ||
04/10/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
04/10/2023 | RSBU - Building Final | Passed | ||
04/10/2023 | COT - RSME - Mechanical Final | Passed | ||
04/10/2023 | COT - RSEL - Electrical Final | Passed |