Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Apply Date:
04/28/2022
Applicant:
burak bekat
Description:
SFR BRIOS1432 T20-M0059

Permit Reviews

Permit Number - T22CM03193
Permit Status: Complete
Permit Description: SFR BRIOS1432 T20-M0059
Start Date Submittal Complete Date Status  
04/28/2022 OTHER 06/08/2022 COMPLETED Review Details
02/06/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 02/06/2024 APPROVED Review Details
02/29/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 03/05/2024 APPROVED Review Details

Conditions

Permit Number - T22CM03193
Permit Status: Complete
Permit Description: SFR BRIOS1432 T20-M0059
Date Description Comments
04/28/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
05/10/2022 ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)
05/10/2022 SPECIAL INSPECTION FORMS AND REPORTS REQUIRED PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY.
05/10/2022 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
05/10/2022 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.
05/10/2022 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
05/10/2022 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
05/12/2022 WATER METER SIZE

Outstanding Inspections

Permit Status: Complete
Permit Number: T22CM03193
Permite Description: SFR BRIOS1432 T20-M0059
Total Outstanding Inspections - 5
Last Inspection Date Description Inspector Results Comments
03/13/2023 COT - LCPL - Plumbing Intermediate N/A Not Ready
03/13/2023 RSME - Mechanical Progress N/A Not Ready
11/20/2023 COT - RSBU - Sustainability N/A Not Applicable
11/20/2023 COT - RSEL - Construction Power N/A Not Applicable
11/20/2023 RSBU - Building Final N/A Not Ready

Completed Inspections

Permit Status: Complete
Permit Number: T22CM03193
Permit Description: SFR BRIOS1432 T20-M0059
Total Completed Inspections - 20
Date Description Inspector Results Comments
08/30/2022 COT - RSPL - Rough Soil Passed {Activity date: 08/30/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved}
09/12/2022 COT - RSEL - Grounding/Bonding Passed {Activity date: 09/12/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved}
09/12/2022 COT - RSBU - Preslab Passed {Activity date: 09/12/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved}
09/29/2022 COT - RSBU - Roof Nailing Passed {Activity date: 09/29/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved}
03/10/2023 COT - RSBU - Exterior Clips/Sheathing Passed
03/10/2023 RSEL - Electrical Progress Passed
03/10/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
03/16/2023 COT - LCPL - Plumbing Intermediate Passed
03/15/2023 COT - LCBU - Framing Passed
03/15/2023 RSME - Mechanical Progress Passed
04/04/2023 COT - HCBU - Interior Shear Bracing Passed
10/02/2023 BULD - Electrical Clearance Passed 10/2/23 clearance ECO
11/20/2023 COT - RSME - Mechanical Final Passed
11/20/2023 COT - RSPL - Sewer Passed
11/20/2023 COT - RSEL - Electrical Final Passed
11/20/2023 COT - RSPL - Yard Water Line Passed
11/20/2023 COT - RSEL - Electrical Underground Passed
11/20/2023 COT - RSPL - Plumbing Final Passed
02/12/2024 ENGR Engineering Final Passed
02/20/2024 RSBU - Building Final Passed OK for CofO

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
3 BEDROOM STRUCTURAL CALCS REV1_V1.PDF DOCUMENTS VIEW
SIC BLDG 67 2-26-24-2024-02-27_V1.PDF DOCUMENTS VIEW
BLDG 67 SIC-2024-02-05_V1.PDF DOCUMENTS VIEW
CONS-BRIOSO_AT_THE_BRIDGES_MODEL_SFR_3BR_APPROVED_PLANS_V1.PDF DOCUMENTS VIEW
APPLICATION T22CM03193.PDF DOCUMENTS VIEW
JOB CARD_T22CM03193.PDF DOCUMENTS VIEW
PERMIT_T22CM03193.PDF DOCUMENTS VIEW
SIC BLDG 67.PDF DOCUMENTS VIEW
UTILITY PLAN BLDG'S 56-67.PDF DOCUMENTS VIEW