Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Apply Date:
04/26/2022
Applicant:
Helen Ormsby
Description:
SFR DRHOH30K21 T21-M0046

Permit Reviews

Permit Number - T22CM03100
Permit Status: Complete
Permit Description: SFR DRHOH30K21 T21-M0046
Start Date Submittal Complete Date Status  
03/20/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 03/22/2023 APPROVED Review Details
02/10/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 02/13/2023 APPROVED Review Details

Conditions

Permit Number - T22CM03100
Permit Status: Complete
Permit Description: SFR DRHOH30K21 T21-M0046
Date Description Comments
04/26/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
04/26/2022 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
04/26/2022 NO FINAL UNTIL THE PUBLIC SEWER G-2018-112(P21WP00113) IS ACCEPTED AND RELEASED BY PCRWRD

Outstanding Inspections

Permit Status: Complete
Permit Number: T22CM03100
Permite Description: SFR DRHOH30K21 T21-M0046
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
10/26/2022 COT - RSPL - Rough Soil N/A Not Ready
10/27/2022 COT - RSPL - Plumbing Final N/A Not Ready

Completed Inspections

Permit Status: Complete
Permit Number: T22CM03100
Permit Description: SFR DRHOH30K21 T21-M0046
Total Completed Inspections - 22
Date Description Inspector Results Comments
11/16/2022 COT - RSBU - Preslab Passed
12/01/2022 COT - RSBU - Roof Nailing Passed
12/22/2022 COT - RSBU - Exterior Clips/Sheathing Passed
01/05/2023 COT - RSPL - Sewer Passed
01/09/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
01/09/2023 COT - LCBU - Framing Passed
01/09/2023 COT - LCPL - Plumbing Intermediate Passed
01/09/2023 COT - RSPL - Yard Water Line Passed
01/09/2023 COT - RSEL - Electrical Underground Passed
01/09/2023 RSME - Mechanical Progress Passed
01/09/2023 COT - RSPL - Gas Pressure Test Passed
01/09/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
01/23/2023 COT - RSEL - Grounding/Bonding Passed 2 ground rods installed 6’ apart. panel is properly grounded.
01/23/2023 COT - RSEL - Construction Power Passed
02/27/2023 COT - HCBU - Interior Shear Bracing Passed Shear walls are properly installed and screwed off.
03/17/2023 BULD - Electrical Clearance Passed Clearance for TEP ECO. 3/17/2023
03/23/2023 COT - BULD - SWG Clearance Passed
03/27/2023 COT - RSEL - Outdoor Lighting Passed
03/28/2023 COT - RSPL - Plumbing Final Passed Corrections were made. 3/28/2023
03/28/2023 COT - RSEL - Electrical Final Passed Corrections were made. 3/28/2023
03/28/2023 COT - RSME - Mechanical Final Passed Corrections were made. 3/28/2023
03/29/2023 RSBU - Building Final Passed Approved. Corrections were made. 3/29/2023

Documents

File Name Document Type  
APPLICATION.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
SIC.PDF DOCUMENTS VIEW
SITE PLAN.PDF DOCUMENTS VIEW
SVB 17 PT REPORT-2023-03-03_V1.PDF DOCUMENTS VIEW
SVB 17 SIC-2023-03-03_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
SVB 17 REV1 NARRATIVE LETTER_V1.PDF DOCUMENTS VIEW
SVB 17 SIC-2023-01-27_V1.PDF DOCUMENTS VIEW