Permit: T22CM03091
Permit Details
Status:
Final
Type:
SOLAR WAIVER - RES
Address:
2625 E RICKEY VISTA
Address NEW:
2625 E RICKEY VISTA
Apply Date:
04/26/2022
Applicant:
ADT Solar LLC
Description:
R - NEW 240V/225A RATING, SOLAR READY METER/MAIN COMBO. PANEL (US2: MC4040S1200SC) ,SINGLE PHASE, WITH NEW 125A MAIN BREAKER PHOTOVOLTAIC ROOF MOUNT SYSTEM ADT SOLAR LLC 26 MODULES-ROOF MOUNTED - 9.88 kW DC, 7.54 kW AC
Contractors:
- ADT Solar LLC
Permit Reviews
Permit Number - T22CM03091
Permit Status: Final
Permit Description: R - NEW 240V/225A RATING, SOLAR READY METER/MAIN COMBO. PANEL (US2: MC4040S1200SC) ,SINGLE PHASE, WITH NEW 125A MAIN BREAKER
PHOTOVOLTAIC ROOF MOUNT SYSTEM ADT SOLAR LLC 26 MODULES-ROOF MOUNTED - 9.88 kW DC, 7.54 kW AC
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/14/2022 | OTHER | 06/17/2022 | COMPLETED |
Completed Inspections
Permit Status: Final
Permit Number: T22CM03091
Permit Description: R - NEW 240V/225A RATING, SOLAR READY METER/MAIN COMBO. PANEL (US2: MC4040S1200SC) ,SINGLE PHASE, WITH NEW 125A MAIN BREAKER
PHOTOVOLTAIC ROOF MOUNT SYSTEM ADT SOLAR LLC 26 MODULES-ROOF MOUNTED - 9.88 kW DC, 7.54 kW AC
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/22/2022 | ELECTRIC - FINAL | TGAUSP | Approved | Approved, INCR Clearance was called into TEP Natalie at 9:50am (power-kill) |
| 08/25/2022 | TEP CLEARANCE - PM | DQUINN | Approved | CODE DGC |
| 08/25/2022 | BUILDING - FINAL | DQUINN | Approved | Ap Clear dgc |