Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Apply Date:
04/26/2022
Applicant:
Helen Ormsby
Description:
SFR DRHOH35F21 T21-M0043: REV 1 as-built wall location REV 2 update to Special Inspection Cert

Permit Reviews

Permit Number - T22CM03083
Permit Status: Complete
Permit Description: SFR DRHOH35F21 T21-M0043: REV 1 as-built wall location REV 2 update to Special Inspection Cert
Start Date Submittal Complete Date Status  
01/12/2023 RESIDENTIAL NEW DWELLING v.1 01/13/2023 APPROVED Review Details
03/20/2023 RESIDENTIAL NEW DWELLING v.1 03/23/2023 APPROVED Review Details
02/10/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 02/15/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - T22CM03083
Permit Status: Complete
Permit Description: SFR DRHOH35F21 T21-M0043: REV 1 as-built wall location REV 2 update to Special Inspection Cert
Total Outstanding Activity Conditions - 2
Date Name
04/26/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
04/26/2022 NO FINAL UNTIL THE PUBLIC SEWER G-2018-112(P21WP00113) IS ACCEPTED AND RELEASED BY PCRWRD

Conditions

Permit Number - T22CM03083
Permit Status: Complete
Permit Description: SFR DRHOH35F21 T21-M0043: REV 1 as-built wall location REV 2 update to Special Inspection Cert
Date Description Comments
04/26/2022 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: T22CM03083
Permite Description: SFR DRHOH35F21 T21-M0043: REV 1 as-built wall location REV 2 update to Special Inspection Cert
Total Outstanding Inspections - 6
Last Inspection Date Description Inspector Results Comments
10/26/2022 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing N/A Not Ready
12/12/2022 COT - RSPL - Gas Pressure Test N/A Not Ready add pressure to line.
12/12/2022 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Not Ready add receptacles in rooms. provide DWV test. fire stop all top penetrations.
12/12/2022 COT - LCBU - Framing N/A Not Ready missing anchor bolts on edges of bottom plates.
12/12/2022 COT - LCPL - Plumbing Intermediate N/A Not Ready provide DWV test. add water to shower and tub.
10/27/2022 COT - RSPL - Plumbing Final N/A Not Ready

Completed Inspections

Permit Status: Complete
Permit Number: T22CM03083
Permit Description: SFR DRHOH35F21 T21-M0043: REV 1 as-built wall location REV 2 update to Special Inspection Cert
Total Completed Inspections - 23
Date Description Inspector Results Comments
10/06/2022 COT - RSPL - Rough Soil Passed {Activity date: 10/06/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Approved}
10/14/2022 COT - RSEL - Grounding/Bonding Passed {Activity date: 10/14/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved}
10/14/2022 COT - RSBU - Preslab Passed {Activity date: 10/14/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved}
10/14/2022 COT - RSEL - Electrical Underground Passed {Activity date: 10/14/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved}
10/14/2022 COT - RSBU - Excavation/Rebar/Zoning Passed {Activity date: 10/14/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved}
11/16/2022 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
12/12/2022 COT - RSBU - Roof Nailing Passed
12/12/2022 RSME - Mechanical Progress Passed
12/13/2022 COT - RSPL - Gas Pressure Test Passed
12/13/2022 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
12/13/2022 COT - LCBU - Framing Passed
12/14/2022 COT - LCPL - Plumbing Intermediate Passed
12/16/2022 COT - RSEL - Construction Power Passed
12/28/2022 COT - HCBU - Interior Shear Bracing Passed
01/05/2023 COT - RSPL - Sewer Passed
01/13/2023 BULD - Electrical Clearance Passed
02/27/2023 COT - BULD - SWG Clearance Passed Ok to set gas meter.
02/27/2023 COT - RSPL - Yard Water Line Passed
03/14/2023 COT - RSPL - Plumbing Final Passed
03/14/2023 RSBU - Building Final Passed
03/14/2023 COT - RSEL - Electrical Final Passed
03/14/2023 COT - RSEL - Outdoor Lighting Passed
03/14/2023 COT - RSME - Mechanical Final Passed