Permit: T22CM03083
Permit Details
Apply Date:
04/26/2022
Applicant:
Helen Ormsby
Description:
SFR DRHOH35F21 T21-M0043: REV 1 as-built wall location REV 2 update to Special Inspection Cert
Permit Reviews
Permit Number - T22CM03083
Permit Status: Complete
Permit Description: SFR DRHOH35F21 T21-M0043: REV 1 as-built wall location REV 2 update to Special Inspection Cert
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/12/2023 | RESIDENTIAL NEW DWELLING v.1 | 01/13/2023 | APPROVED |
03/20/2023 | RESIDENTIAL NEW DWELLING v.1 | 03/23/2023 | APPROVED |
02/10/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 02/15/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - T22CM03083
Permit Status: Complete
Permit Description: SFR DRHOH35F21 T21-M0043: REV 1 as-built wall location REV 2 update to Special Inspection Cert
Total Outstanding Activity Conditions - 2
Date | Name |
---|---|
04/26/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
04/26/2022 | NO FINAL UNTIL THE PUBLIC SEWER G-2018-112(P21WP00113) IS ACCEPTED AND RELEASED BY PCRWRD |
Conditions
Permit Number - T22CM03083
Permit Status: Complete
Permit Description: SFR DRHOH35F21 T21-M0043: REV 1 as-built wall location REV 2 update to Special Inspection Cert
Date | Description | Comments |
---|---|---|
04/26/2022 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: T22CM03083
Permite Description: SFR DRHOH35F21 T21-M0043: REV 1 as-built wall location REV 2 update to Special Inspection Cert
Total Outstanding Inspections - 6
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/26/2022 | COT - RSBU - Exterior Clips/Sheathing | N/A | Not Ready | |
12/12/2022 | COT - RSPL - Gas Pressure Test | N/A | Not Ready | add pressure to line. |
12/12/2022 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Not Ready | add receptacles in rooms. provide DWV test. fire stop all top penetrations. |
12/12/2022 | COT - LCBU - Framing | N/A | Not Ready | missing anchor bolts on edges of bottom plates. |
12/12/2022 | COT - LCPL - Plumbing Intermediate | N/A | Not Ready | provide DWV test. add water to shower and tub. |
10/27/2022 | COT - RSPL - Plumbing Final | N/A | Not Ready |
Completed Inspections
Permit Status: Complete
Permit Number: T22CM03083
Permit Description: SFR DRHOH35F21 T21-M0043: REV 1 as-built wall location REV 2 update to Special Inspection Cert
Total Completed Inspections - 23
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/06/2022 | COT - RSPL - Rough Soil | Passed | {Activity date: 10/06/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Approved} | |
10/14/2022 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 10/14/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved} | |
10/14/2022 | COT - RSBU - Preslab | Passed | {Activity date: 10/14/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved} | |
10/14/2022 | COT - RSEL - Electrical Underground | Passed | {Activity date: 10/14/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved} | |
10/14/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 10/14/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved} | |
11/16/2022 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
12/12/2022 | COT - RSBU - Roof Nailing | Passed | ||
12/12/2022 | RSME - Mechanical Progress | Passed | ||
12/13/2022 | COT - RSPL - Gas Pressure Test | Passed | ||
12/13/2022 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
12/13/2022 | COT - LCBU - Framing | Passed | ||
12/14/2022 | COT - LCPL - Plumbing Intermediate | Passed | ||
12/16/2022 | COT - RSEL - Construction Power | Passed | ||
12/28/2022 | COT - HCBU - Interior Shear Bracing | Passed | ||
01/05/2023 | COT - RSPL - Sewer | Passed | ||
01/13/2023 | BULD - Electrical Clearance | Passed | ||
02/27/2023 | COT - BULD - SWG Clearance | Passed | Ok to set gas meter. | |
02/27/2023 | COT - RSPL - Yard Water Line | Passed | ||
03/14/2023 | COT - RSPL - Plumbing Final | Passed | ||
03/14/2023 | RSBU - Building Final | Passed | ||
03/14/2023 | COT - RSEL - Electrical Final | Passed | ||
03/14/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
03/14/2023 | COT - RSME - Mechanical Final | Passed |